Tenders Are Invited For Fire Fighting Deluge Valves Water Gongs Pipe Lines Surface Preparation Painting

Tender Detail

49025809
2332200462
Self Funded
Tenders Are Invited For Fire Fighting Deluge Valves Water Gongs Pipe Lines Surface Preparation Painting
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
08-03-2022

Work Detail

Quotation Are Invited For Fire Fighting Deluge Valves Water Gongs Pipe Lines Surface Preparation PaintingFor E Station Fire Fightin 1032200694Rfx DescriptionFor E Station Fire Fighting Deluge Valves Water Gongs PipeLines Surface Preparation Painting Dewa Contact Person GopalTewari 0508806977 1 Item 00001 External Surface Preparation And PaintingOf Fire Fighting System Deluge Valves AndAssociated Pipe Lines At E Station Japs TecHnical Specifications Carry Out ExternalSurface Preparation By Hydro Blasting Mechanical Cleaning And Painting OfExisting Fire FIghting Deluge Valves Water Gongs AndAssociated Pipe Lines Up To 03Meters At E Station Japs Total Deluge Valve Quantity 30Nos Contractor S Scope Of Work The ScopeOf Work Includes External SurfacePreparation By Hydro Washing And ManualCleaning And PainTing Of Existing Fire Fighting System DelugeValves Along With Pipe Lines A SurfacePreparation To Be Done With A TemporaryEnclosUre Erected By The Contractor AfterBarricading The Area B TheWaste Residues After Such Work Should Be Cleared On A DaiLy Basis C Any Defect Observed AfterHydro Washing Such As Associated PipeLine Elbow Tee Valve Nozzles Union Nipples To BeNotify Dewa Supervisor To Attend ItImmediately D Any Hot Work Should HavePrior Written Permit From Dewa E DuringJob Execution One Certified Safety Supervisor FromContractor Should Be At Site For SafetyOf The Workmen F The Contractor SSupervisorShould Have Risk Assessment MethodStatement At Site And Should Provide ToolBox Talks On Daily Basis G TheContractor Shall Visit The Site For Full FamiliarizationWith The Work Scope Plant Access Facilities Complexities Safety MeasuresEtc Before Submitting His Bid TheMentioned Scope Here Is Indicative Only H All The Persons Should Wear TheUniform Ppe While At Work Indicating TheOrganizations Logo And Company Name I The Contractor Is Not Allowed To KeepInflammable Or ExplosiVe Substances In The Plant Areas J TheWarning Sign Boards Should Be Provided ByThe Contractor As Work In Progress NoEntry ETc At The Entry And Wherever Required K Only Approved Calibrated And TestedMachines Materials Shall Be Used L HandAnd Powered Tools Rigging Tools Material HandlingFacilities Inspection Tools AndAccessories M Tarpaulins Hand AndWorking Lamps TemporAry Supports Etc N Personal Safety Protection Equipment First Aid Kit For HisStaff To Be Present At Site O In GeneralAll ItEms Of Tools Accessories Consumable Hoses Cables Distribution Board Etc Other Than Facilities Provided By DewaShall Be ArrangEd By The Contractor P TheContractor Shall Ensure Housekeeping OnA Daily Basis Q All Dewa Safety Environment Policy Rules And Regulation Shall Be FollowedAt Work Site During The Execution Of TheWork The Contractor Should Be FamiliarWith Safety Regulations While WorkingIn A Hazardous Area R Entry Permits ForThe Workers Should Be Applied 05DaysPrior COntractor To Start The Job With PassportCopies Having Valid Visa And Shall Be OnContractor S Payroll S Entry PermitsFor TheVehicle Should Be Applied With Copies OfRegistration Driving License And HisPassport Copy With Valid Visa T AllMaterial AndTools Brought In Shall Be Declared At Power Station Security Gate And The ListOf These Items Shall Be Signed By DewaSecurity The Copies Of These Documents Shall BeLodged With Dewa Engineer In Charge OnDaily Basis This Document Will Be The BasisFor The CleArance Gate Pass To Take Them Out OnCompletion Of The Job U DewaEngineer In Charge Shall Be Updated TheWork Progress ON A Regular Basis V The Job Carried OutUnder This Contract Shall Be InspectedBy Dewa Engineers At All Stage They ShallHAve Free Access To Contractor Site AtAll Times Only After Inspection Certification By Dewa Engineers The JobShall PrOceed Further 3 Surface Preparation A The Entire Specified Fire Fighting DelugeValves And Associated Pipe Lines To Be Cleaned By Hydro Washing And Mechanical Cleaning To Remove Corrosion Loose Dusts Salts Pollutants And OldPeeled OfF Paint B On Preliminary Preparation AsAbove The Surface PreparationIncluding All Size Of Pipe Lines ValvesShall Be Mechanically Cleaned Using Wire Brush Emery Paper And Small Grinding MachineFor Buffing C All Sharp Corners Contours Weld Imperfections Imperfect Joints ShallBe Dressed Smooth By Mechanical MeansSuch As Chipping Filing Grinding Etc Until The Surfaces Prepared For Primer Painting A The Surface Preparation ShallBe In Line With As Per RelevantInternational StAndards 4 Application Of Paints A AllMixing Application Curing Guidelines ForThe Paints As Specified In Product TeChnical Data Sheets Must Be Strictly Adhered To All Times B Painting WorkShould Not Take Place If 1 The SurfacePreparaTion Is Incomplete Or Not According ToManufacturer S Recommendations 2 TheAtmospheric Temperature Is Below 10 C AndAbove 50 C 3 The Relevant Humidity Exceeds75 4 The Substrate Temperature Is LessThan 3 C Above The Dew PoiNt 5 The Surface Is Not Cleared By SiteEngineer Of Dewa On Inspection 6 During Application Regular Wet DryFilmThickness Readings And RelativeHumidity Levels Shall Be Taken AndRecorded 7 The Topcoats On The SurfaceWill Be Decided By Authorities Personals Such AsDewa Engineer C In Any Case The PrimerCoats Should Not Be Applied Until TheSurFace Have Been Inspected Approved By The Engineer Or His Duly AppointedRepresentative D The Recoat IntervalsBetween The Individual Coats Of Paint Must Be ThoseGiven By The Paint Manufacturer BeforeEvery Coat Of Paint The Surface Has To BeCleaned Damages To The Previously Applied CoatsAre To Be Repaired In Accordance With TheRelevant Paint Specifications E The LastFinaL Coat Should Not Be Applied BeforeEnsuring A Clean And Uniform GeneralAppearance 5 Painting Specification A The RequirEd Dft Shall Be Checked With NonDestructive Magnetic Or Electrical Gauges The Following Operations To Be FollowedFor Painting 1 Surface Preparation As Per Standard 2 Primer Inorganic Zinc Ethyl Silicate OrTwo Pack Epoxy Zinc Rich PolyamiDe Mic 75 3 Intermediate Red Pilot Ii Jotun Std 0256 Product Code362Xalx05 Mic 125 4 Finish TWo Pack Mic 50 Supplied By Dewa Total Dft250 Microns B In All Stages Dft To BeChecked By Dewa Engineers C All PaintsSubJect To Dewa Approval 7 Guarantee A The Coating Work Covered Under ThisTender Shall Carry A Back To BackGuarantee Of THree Years Against Defective CoatingMaterials And Faulty Application OrWorkmanship B During Three Years OfGuarantee PeriOd All Coatings Shall Be Free From AllDefects Including Pinholes Blasters Loss Of Adhesion Peeling Cracks WeatheriNg Etc C Whenever A Defect Is NoticedDuring The Guarantee Period The BidderMust Rectify The Defect Within AReasonable Period Of Time Awarded By Dewa D ThereShould Be A Six Monthly Inspection Of The Coating During The Guarantee Period E It Will Be The Responsibility Of TheContractor To Ensure That TheseInspections Are Carried Out WorkSchedule A The Bidder Shall Provide A Detailed Schedule Of WorkUnder This Tender Indicating AllSupplies Preparation And Application OfPaint B All Exceptions Technical AndCommercial Shall Be Highlighted In TheFormat Schedule Of Exception TheExceptions Not IndicatEd Therein Will Not Be Considered ForTender Evaluation And Shall Not Be ThePart Of The Contract That EvolvesThereafter C The BiDder Will Provide Detail About The SurfacePreparation On Every 10Meter Length Paints Application And Test ProceduresEtC D The Contractor Will Submit DailyProgress Report Regularly In The Prescribed 1 JobStandard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail