GTR 48290567
General Procurement Notice for Saint Vincent And The Grenadines Volcanic Eruption Emergency Project
ICB — International Competitive Bid
Closed
Caribbean
Tender Information
GTR Reference
48290567
Tendering Authority
Subscribe to view
Financer Name
World Bank
Work Title
General Procurement Notice for Saint Vincent And The Grenadines Volcanic Eruption Emergency Project
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Caribbean
Last Date of Bid Submission
07-02-2023
Closed
Work Detail
Saint Vincent And The Grenadines Volcanic Eruption Emergency Project The Project Will Include The Following Components Component 1: Early Recovery Income Support (Usd 7,500,000) Subcomponent 1.1. Temporary Grants And Support Services Program The Objective Of This Subcomponent Is To Support The Continuation, Expansion, And Strengthening Of The Ongoing Temporary Grants And Complementary Support Services. Temporary Grants: Through The Ministry Of National Mobilization, Social Development, Family, Gender Affairs, Youth, Housing, And Informal Human Settlement (Monm), The Government Will Be Providing Unconditional Temporary Grants To Approximately 4,000 Displaced Households Affected By The Volcanic Eruption Of La Soufrière. This Program Targets Selected Poor Or Vulnerable Households From The Red, Orange, And Yellow Zones Displaced By The Volcanic Eruptions Of La Soufrière, Who Will Be Provided With Income Support For A Period Of Six Months. Support Services: This Subcomponent Will Finance Temporary Grants, Goods And Consulting Services, Including Financing Consultancies And Services Related To Communications, Training Of Beneficiaries, Hiring Of Facilitators, And Procurement Of Material And Basic Equipment To Deliver The Support Services. Subcomponent 1.2. Labor Intensive Temporary Employment (Lite) Program The Subcomponent Will Support, On An As-Needed Basis, The Implementation Of A Lite Program To Provide Cash-For-Work In The Event Of Natural And/Or Climate-Related Disasters (Including Risks Associated With Heavy Rains Mobilizing Ashfall And Volcanic Debris). It Will Also Support The Longer-Term Resilient Recovery Of Community Infrastructure. This Subcomponent Will Respond To The Government’S Request To Support Cleaning Activities Associated With Ex-Ante Disaster Mitigation Or Ex-Post Emergency Response Or Infrastructure Recovery And Protect Transportation Routes From The Accumulation Of Volcanic Ash, Flood Water And Debris Following The Volcanic Eruptions Of La Soufrière And Other Climate-Related Events. Component 2: Restoration And “Building Back Better” Of Critical Services, And Strengthening Of Emergency Preparedness And Response Capacity (Usd 29,000,000 And Euro €1,650,000) Subcomponent 2.1. Support To Reconstruction Planning That Incorporates Climate Change Considerations. This Will Support The Integration Of Necessary Climate And Disaster Considerations Into Technical Studies, Feasibility Studies, And Detailed Engineering Designs Of Infrastructure Interventions And Operations Mainly In Public Facilities, Transport Infrastructure, Water Supply Systems, Agricultural Centers, And Slope Stabilization. These Studies Will Address The Critical Needs Of Reconstruction While Helping St. Vincent And The Grenadines To Be Better Prepared For The Impacts Of Climate Change And Build Resilience Into Physical And Operational Infrastructure, Including The Resilient Operation Of Systems During Disasters, In A More Inclusive Manner. Subcomponent 2.2. The Restoration And Reconstruction Of Critical Infrastructure Services. Activities Will Be Assessed Against The Context Of Changing Climate Patterns And The Integration Of Mitigation And Adaptation Interventions In Restoration And Reconstruction. Using The Emergency Operation To Support “Building Back Better” Will Help The Gosvg Adapt To And Increase Resilience To Disasters And Climate Change. Reconstruction And Rehabilitation Works Will Be Complemented By Functional Upgrades And Climate-Resistant Designs, Including Energy Efficiency Features Where Relevant, Through The Enforcement Of Building Code Legislation To Increase The Resilience Of Buildings To Climate-Related Risks. Immediate Restoration Of Services:The Project Will Support Physical Response Activities, Including Materials And Construction Services; Equipment Rental; Design And Construction Supervision For Works Contracts Under The Ministry Of Transport, Works, Lands, And Physical Planning (Motw), National Emergency Management Organisation (Nemo), Central Water And Sewerage Authority (Cwsa); And Other Expenditures Relating To Restoration And Rehabilitation Operations. The Potential Response And Immediate Restoration Activities Will Include: (A) Cleanup Of Volcanic Ash And Debris; (B) Restoration/Augmentation Of Affected Water Supply Systems; (C) River Cleaning; (D) Purchase And/Or Rental Of Machinery And Equipment (Including Agricultural Equipment And Supplies For Restoration Of Agriculture Productivity); (E) Reconstruction Of Schools, Roads, Drains, Culverts, Bridges,And Emergency Warehouses; And (F) Restoration Of Transport Infrastructure. A Prioritized List Of Public Infrastructure In Need Of Restoration Or Reconstruction Will Be Included Under The Pom, With A Focus On Identifying Measures To Increase Climate And Disaster Resilience: Prioritization Will Be Carried Out Using Participatory Approaches In Line With The Project’S Environmental And Social (E&S) Instruments. This Will Ensure E&S Risks Are Duly Considered In Finalizing Investments To Enhance Resilience To Climate Change Impacts And To Mitigate Potential Negative Environmental Or Social Impacts. Subcomponent 2.3. Strengthening Of Ep&R Systems And Capacity. This Activity Aims To Improve The Capability Of The Gosvg To Systematically Prepare For And Respond To Potential Compounding Emergencies And The Impacts Of A Changing Climate, Particularly In Line With Its Mandate Under The National Emergency Response Plans For Multiple Hazards (Recurrent Annual Events As Well As Low-Frequency, High-Impact Disasters). Activities Under This Component Will Address The Critical Impediments And, In So Doing, Improve Capacities And Capabilities To Prepare For And Respond To Emergencies Such As Volcanic Eruptions, Earthquakes, And Climate Change-Induced Disasters Such As Hurricanes And Floods. Parallel Co-Financing Under The Eu-Caribbean Regional Resilience Building Facility Managed By The Global Facility For Disaster Reduction And Recovery (Gfdrr) Is Being Arranged To Support Activities To Strengthen The Multi-Hazard Emergency Preparedness And Response (Ep&R) Systems In St. Vincent And The Grenadines. In This Regard, Euro €1,650,000 (Us$2Million) Through The Eu-Caribbean Regional Resilience Building Facility Trust Fund Will Complement Project Funding To Strengthen Nemo’S Ep&R Capacity.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
0966e4c6-3030-4a93-a114-5aa71d879c13.htm
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.