GTR 48116383
Tenders Are Invited For Reinforcing Bar Insertion Work Reinforcing Bar Insertion Work, Etc
ICB — International Competitive Bid
Closed
Eastern Asia
Tender Information
GTR Reference
48116383
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reinforcing Bar Insertion Work Reinforcing Bar Insertion Work, Etc
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Asia
Political Region
Asia Pacific Economic Cooperation APEC,G20
Last Date of Bid Submission
11-03-2022
Closed
Work Detail
Tenders Are Invited For Reinforcing Bar Insertion Work Reinforcing Bar Insertion Work, Etc. Reinforcing Bar Insertion Work Reinforcing Bar Insertion Work: 212 (No Scaffolding Method, 3.5 M / Piece, Drilling / Reinforcing Bar Insertion ) Work / Injection Driving Work / Head Tightening Work, Grout Material Cost, Confirmation Test 6 Times, Reinforcing Bar Insertion Pressure Receiving Plate Work (Both Bearing Plate)) Spraying Frame Work ( 200 Pressure Receiving Plate Connecting Beam): 746 M 3 Drain Mortal Work: 6 M 2 Las Tension Work (Rebar Wire Net 2-50 × 50): 816 M 2 Vegetation Base Material Spray Work (Spraying Inside The Frame T = 3 Cm): 480 M ): 157 M (Including U-Shaped Side Groove Pu300b Stretched Concrete) 1 Temporary Work / Temporary Road Work (Installation Work) 3 Excavation (Earth And Sand): 490 M 3 Filling (Diversion Soil): 170 M 3 Small Earth And Sand Transportation (Transportation On Rough Terrain ) Car): 150 M 2 Slope Shaping Work (Cut Part, Sandy Soil): 330 M 3 Concrete Placement (18N-8-40, T = 10 Cm,): 38 M 2 Form (Leveling Concrete): 26 M 2 Roadbed Work (Rc-40, T = 10 Cm): 378 M Temporary Drainage Ditch Work (18N-8-40): 107 M Temporary Drainage Pipe Work (Polyethylene Water Absorption Pipe 200: 17 ) M Large Soil Stacking Work (Diversion Soil): 143 Mud Drop Machine For Bag Dump Car (Including Dry Installation / Removal): 2 Units / Temporary Waterway Work (Installation Work) 3 Collapse Excavation: 150 M Temporary Pipe Work (High-Density Polyethylene Pipe ) 1000): 72 M Small-Sized Soil Sewage (Diversion Soil): 30 Bags / Temporary Large Soil Sewage Work Large Soil Sewage Work (Earth And Sand Reservoir (Middle Stage), Diversion Soil): 94 Bags / Temporary Sewage Work 3 Temporary Sewage (Diversion Soil ) ): 970 M 3 Concrete Placement (18N-8-40, T = 10 Cm): 33 M 2 Roadbed Work (Rc-40, T = 10 Cm): 327 M Temporary Drainage Ditch (18N-8-40, T = 5 Cm ) ): 41 M Temporary Drainage Pipe (Polyethylene Water Absorption Pipe 200): 3 M Removal Work 3 Mortal Shell Loading: 101 M 3 Mortal Shell Transportation: 101 M Mortal Shell Disposal: 238 T [Disclaimer: The Above Text Is Machine Translated. For Accurate Information Kindly Refer The Original Document.]
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c0dd8062-d3b1-439a-812e-6e6f0dbdefe8.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.