GTR 47706121
Tenders Are Invited For Complete Overhauling Of Booster Pump For Najma Ph3 Weir Pump
ICB — International Competitive Bid
Closed
Western Asia
Tender Information
GTR Reference
47706121
Tendering Authority
Subscribe to view
Tender No
2332200130
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Complete Overhauling Of Booster Pump For Najma Ph3 Weir Pump
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
21-01-2022
Closed
Work Detail
Quotation Are Invited For Complete Overhauling Of Booster Pump For Najma Ph3 Weir Pump. Complete Overhauling Of Booster Pump For Najma Ph3 Weir Pump. Pump Details: Make- Weir, Model-Sda 400/ 500B (Horizontal), Capacity-5 25 Lit./Sec. Please Contact Mr. Noor (052-9172523) For Further Clarification. Technical Specifications 1.0#Introduction Dubai Electricity & Water Authority (Dewa) Owns And Operates Potable Water Booster Pumping Stations At Various Locations Of Dubai. These B Ooster Pumping Stations Along With Their Accessories Are Maintained Regularly And Taken Out Of Service In A Planned Sequence Mostly In Winter To Carry Out The Preventive Maintenance, Inspections & Overhauling Etc. 2.0#Scope Of Work The Scope Of Work For The Ove Rhaul Of Booster Pumps And Their Accessories Of Booster Pumping Station. # A)#The Contractor Has To Take The Pump Assembly From Dew A Site To Their Workshop & Vice Versa. Dewa Shall Not Provide Any Transport To Shift The Same. For Loading & Unloading Contractor C An Use Dewa Overhead Crane Available At Pumping Stations In Coordination With The Dewa Representatives. B)#Mechanical Seal Replaceme Nt, Coupling Bush Renewal & Gland Packing Renewal, Bearing Replacement As Required. C)#Overhauling Of Pump (See Annexure I & Ii) D)# Painting Of Pump Externally E)#Rectification Of The Pump For Any Complaint Rose After Installation. F)#If Any Part Is Found Defectiv E, The Contractor Has To Repair/Replace The Same. Available Spare Shall Be Supplied By Dewa. If Any Spare Is Not Available With Dewa The Contractor Has To Arrange The Same. Additional Cost Of Spare To Be Submitted To Dewa For Approval Before Placing The Order. 3.0#Prior To Submission Of Quotation, The Following Shall Be Determined Carefully: A)#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access Facilities, Complexities, Etc., Before Submitting The Quotation. B)#Dewa W Ill Not Accept Any Claim For Extras Beyond The Order Rates / Prices During And After The Execution Of Work Ordered. C)#The Contract Or Will Be Provided With The Equipment Shutdown Program In Coordination With Operation & Maintenance Department Of Water Division. D)# The Contractor Should Submit The Time Schedule /Bar Chart Indicating Each Activity. E)#On Completion Of The Work, The Inspectio N Checklist Of Quality Procedures, Wherever Applicable Should Be Filled In And Submitted. F)#Site Supervision, Co-Ordination Of Fie Ld Activities, Supply Of Required Technicians, Tools, Equipments, Tackles Etc. Required For Execution Of The Contract Works Shall Be Suitably Considered. 4.0#Take Over On Completion Of All Work Within The Scope Of The Contract, For Acceptance Of The Maintena Nce Work, Contractor Shall Notify Dewa In Writing. A Certificate Of Completion Will Be Issued By Dewa On Final Inspection Only When The Contract Work Is Deemed To Have Been Taken Over By Dewa After Necessary Condition Monitoring Checks Wherever & Whenever Required . 5.0#Warranty A)#All The Work Carried Out Shall Carry A Warranty For 8000 Hours Of Operation Or 1 Year Whichever Is Earlier. B )#The Guarantee Will Take Effect From The Date Of Takeover By Dewa Of The Job Carried Out By The Contractor. C)#When A Defect Is No Ticed During The Period Of Warranty, The Contractor Must Rectify The Defect Within A Reasonable Amount Of Time Fixed By Dewa With No Claim Or Compensation. 6.0#Documents: # On Satisfactory Completion Of The Work & Handing Over, The Contractor Should Submit The F Ollowing To Dewa. ## A)#Inspection Report. B)#Overhaul Report. C)#Job Completion Report For Jobs Other Th An Routine Inspection & Overhauls D)##As-Fitted# Bill Of Materials For Consumption Of Spares E)#Requisition For Planning Of Spares By Dewa Based On Current Condition Of The Equipment For Which Maintenance Work Was Taken Up. Qty: 1 Machining On Pump Shaft Sleeve Of Booster Pump Of Najma Ph3 Weir Pump Please Contact Mr. Noor (04-3229439) For Further Clarification S Scope Of Works: 1. Machining On The Pump Shaft Sleeve To Fit With Pump-Rotor Shaft 2. Assembly With Pump Rotor & Testing Qty: 2 Machining On Shaft Of Booster Pump Of Najma Ph3 Weir Pump Please Contact Mr. Noor (04-3229439) For Further Clarifications Scope O F Works: 1. Pump Shaft De & Nde Side M/Seal And Bearing Areas Rebuilding And Machining 2. Assembly With Pump Rotor & Testing Qty: 1 Complete Overhauling Of Booster Pump For Najma Ph3 Weir Pump. Pump Details: Make- Weir, Model-Sda 400/ 500B (Horizontal), Capacity-525 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
17b6c87c-0200-4afb-a60f-3d1fe46f9afa.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.