Procurement Plan For Adjust The Contractor Selection Plan For Bidding Packages No 76 2021 Package Tn04 2021 Bidding Package Gs04 2021 And Package Cdrl01 2021 Under The 2Nd Machinery 40Mva Tba 110Kv Ninh Hoa
Procurement Plan For Adjust The Contractor Selection Plan For Bidding Packages No 76 2021 Package Tn04 2021 Bidding Package Gs04 2021 And Package Cdrl01 2021 Under The 2Nd Machinery 40Mva Tba 110Kv Ninh Hoa
Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN
03-01-2022
Work Detail
Procurement Plan For Adjust The Contractor Selection Plan For Bidding Packages No 76 2021 Package Tn04 2021 Bidding Package Gs04 2021 And Package Cdrl01 2021 Under The 2Nd Machinery 40Mva Tba 110Kv Ninh HoaDate Approval 03 10 2021Package 1Type WorksName Package No 76 2021 Construction Of Operators Cylindrical Nails Oil Collecting Holes And Supplying Electrical Lighting Systems Indoor Air Conditioners And Fire Protection Systems At Mba Extended OperatorsPrice 1 969 137 875Package 2Type Non ConsultancyName Package Of Tn04 2021 The Most Effective Device Calibration Experiment Second To Install The Second 40Mva Tba 110Kv Ninh HoaPrice 469 729 723Package 3Type ConsultancyName Bidding Package Gs04 2021 2Nd Construction Supervision Consultancy 40Mva Tba 110Kv Ninh HoaPrice 325 622 130Package 4Type Non ConsultancyName Package Cdrl01 2021 Tuning The Relay And Set Up A 2Nd Machine And Installment Plan To Install The Second 40Mva Tba 110Kv Ninh HoaPrice 136 077 583 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.