Tenders are invited for Replacement Of Ng Train 22 Fiscal Metering To Gas Compressor Line Spoolpiece And Elbow And Main Filter To Condensate Tank Drain Line Elbow

Tender Detail

42297239
2332101642
Self Funded
Tenders are invited for Replacement Of Ng Train 22 Fiscal Metering To Gas Compressor Line Spoolpiece And Elbow And Main Filter To Condensate Tank Drain Line Elbow
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
27-07-2021

Work Detail

Quotation Are Invited For Replacement Of Ng Train 22 Fiscal Metering To Gas Compressor Line Spoolpiece And Elbow And Main Filter To Condensate Tank Drain Line Elbow Technical And General Specification Of Outsourcing Work At M Station Jebel Ali Power Station 1 Title Replacement Of Ng Train 22 Fiscal Metering To Gas Compressor Line Spool Piece Elbow And Main Filter To Condensate Tank Drain Line Elbow 2 Size And Quantity 2 1 16 Inch X Schedule Std 01 Meter To 02 Meter Length Pipe Spool 03 Nos 3 Duration 03 Days 4 Work Schedule Work Shall B E Done In Double Shifts Round The Clock During M Station Total Shutdown Tentatively Scheduled In Dec 2021 Or Jan 2022 5 Pre Bid Site Inspection The Contractor Shall Visit The Site And Be Fully Familiar With The Work Scope Plant Access Facilities Complexit Ies Etc Before Submitting The Bid Dewa Will Not Accept Any Claim For Extras Beyond The Order Rates Prices During And After The Execution Of Work 6 Scope Of Work 6 1 Mobilize Men Equipment Within 02 Days Of Advance Notice 6 2 Submit Following Documents To Obtain Ptw 6 2 1 Method Statement 6 2 2 Risk Assessment Of The Work 6 2 3 Toolbox Talk Report 6 3 Obtain Ptw Permit To Wo Rk And Lc Line Clearance From Dewa 6 4 Conduct Site Survey And Safety Inspection To Assess The Working Environment 6 5 Ensur E Site Area Is Correctly Secured And Safe To Work On In All Respects 6 6 Ensure Proper Isolation Of The Line Dewa Chemist Cleara Nce For Lel Hwp Are Obtained Daily Before Start Of Work 6 7 Ensure No Flammable Materials Near The Hot Work Area 6 8 If The Wo Rking Environment Is Safe Proceed With The Following Steps 6 9 Identify Along With Dewa The Area Where Spools To Be Replaced In T He Pipe Rack 6 10 Mark The Pipe Spool For Cutting 6 11 Provide Temporary Pipe Supports As Required 6 12 For Hot Work Welding Booth To Be Provided To Prevent Welding Spark Or Cutting Materials Coming Out From Hot Work Area Ensure To Provide Enough Fire Exti Nguisher Fire Blankets At Site 6 13 Protect The Nearby Lines Cables Using Fire Blanket 6 14 Barricade The Area Below With Sig Nage 6 15 Proceed With Cutting Of Pipe Spools Prepare The Joints 6 16 Simultaneously Cut Spool From Spare Pipe Provided By Dewa For Replacement 6 17 Shift The Spools To Location Using Proper Tested Lifting Tools 6 18 Weld The Pipe Spools 6 19 Rt Of The Weld Joint Dewa S Scope 6 20 Surface Preparation And Painting Of Pipe Dewa S Scope 6 21 Qualified Job Supervisor Shall Be Ass Igned For The Job 6 22 Skilled Fabricators Welders Shall Carry Out All The Jobs 6 23 Weld Joints To Be Made By Qualified Welde R According To Applicable Wps Asme Requirements Wps Welder Certificates To Be Provided 6 24 Housekeeping And Disposal Of Was Te To Be Done Before Site Clearance 6 25 De Mobilize Men And Equipment After Completion Of The Job 6 26 Work Completion Report T O Be Submitted Report Shall Contain Relevant Photos 6 27 All Tools Tackles Are In Contractors Scope 6 28 Proper And Tested T Ools To Be Used 6 29 All Lifting Power Tools Shall Have Valid 3Rd Party Test Certificate 6 30 Welding Machine Shall Have 3Rd P Arty Calibration Certificate 6 31 Dewa Scope 6 31 1 Scaffolding 6 31 2 Supply Of 8 Inch X Sch 40 Pipe 6 31 3 Supply Of 8 Inch X Sch 40 Elbows 6 31 4 Nde 6 31 5 Painting 7 Warranty 7 1 The Warranty Period For The Work Shall Be One Year From The Date Of Completion Of Work Certified By Dewa 7 2 In Case Of Any Damage Defect Of The Work Carried Out Under This Contract Within This War Ranty Period The Contractor Shall Attend And Carry Out The Necessary Repair Work And Rectify The Defect Within Short Period Without Affecting The Production Of Electricity And Water 8 Insurance 8 1 The Contractor Shall Be Responsible For The Insurance Of All Works And Personnel Involved Until The Works Appropriate Document Proof To Be Provided To Dewa Prior To Starting Of Works 8 2 It Is To Be Noted That Only After Scrutiny And Approval Of The Third Party Insurance Policy And The Workmen S Compensation Policy By De Wa Finance Department The Contractor Shall Be Permitted To Mobilize Commence Works At Site 8 3 Before Commencing Execution Of The Works The Successful Bidder But Without Limiting His Obligations And Responsibilities Shall Insure Against Any Damages Loss Or Injury Which May Occur To Any Property Or To Any Person By Or Arising Out Of The Execution Of The Works Or Temporary Works 8 4 A Minimum Of Third Party Insurance For Aed 1 Million Is Required With An Insurer In Terms Approved By Dewa 8 5 The Workmen S Compens Ation Or Similar Insurance As Required By Laws Prevalent In Uae Shall Also Be Taken By The Contractor 9 General Terms Conditions 9 1 The Contractor Shall Visit The Site And Be Fully Familiar With The Work Scope Plant Access Facilities Complexities Safety Measures Etc Before He Submit His Bid 9 2 The Contractor Shall Ensure Housekeeping On A Daily Basis And The Contractor Shall Be Responsible For All Waste Material Disposals To Designated Places 9 3 All Dewa Safety Environment Policy Rules And Regulation Shall Be Followed At Work Site During The Execution Of The Work The Contractor S Engineer Should Be Familiar With Safety Regulation S While Working In A Hazardous Area 9 4 Scaffolding If Required Shall Be Arranged By Dewa 9 5 Qualified Rigger Shall Be Arranged By Contractor For Rigging Activities 9 6 The Work Shall Be Executed Under Dewa Supervision And As Per Quality Schedule Requiremen T 9 7 Contractor S Supervisor Shall Be Available At Site Throughout The Period Of Work 9 8 Service Air Electricity And Water Fo R Work At Dewa Site It Is The Responsibility Of The Contractor To Have His Own Arrangement In Extending The Electricity And Water Utility To His Places Of Work Including Lighting 10 Safety Health And Environment 10 1 The Contractor Shall Comply With All The Requirements Stipulated In The Following Ohs Document From Dewa For Health Safety And Environmental Requirements During The Execut Ion Of The Project 10 1 1 Imsp01 Sp 06 H S Procedure For Contractor And Consultant 10 1 2 Imsp01 Sp 15 Control Of Substan Ces Hazardous To Health Coshs 10 1 3 Japs H 18 Environmental Management System Procedure 10 2 The Contractor S Work Will Fall Within The Purview Of Safety Surveys Conducted Regularly By The Dewa Safety Section All Their Safety Requirements Shall Be Promptly Met The Contractor Shall Check The Condition Suitable To Carry Out The Work Conduct Site Survey And Safety Inspection To Assess Th E Working Environment 10 3 No Wastages Shall Be Left On The Ground Or At Any Area Being Part Of The Contractor S Work Area Sugge Sted To Use Tarpaulin And Or Mesh Cover Surround System 10 4 Execution Of The Work On Ng Piping Should Not Hinder The Function Of The Adjoining Pipes And Other Systems 10 5 Mobile Phones Are Not Allowed Near Ng Lines Or Ng Area 11 Security Permissions 11 1 The Contractor Should Submit The Following Particulars Well In Advance For Dewa To Issue Entry Passes For Them Valid Up To The Perio D Of Contract Work 11 1 1 List Of His Staff Proposed To Be Engaged On The Job With Designation Copy Of Their Valid Passport Labo R Card And Two Pp Size Photographs For Vehicle Drivers Copies Of Their Valid Driving License Also Are To Be Attached 11 1 2 Lis T Of Vehicles With A Copy Of Valid Registration Certificate Vehicle License Of Each Vehicle 11 1 3 List Of Tools Equipment Cons Umables Etc With Delivery Notes For Each 11 1 4 Travel Declaration Form 11 1 5 Undertaking Letter 11 2 The Contractor Shall B Ring Their Materials Equipment Office Facilities Substances Computers Cameras Etc With Their Delivery Note After Dewa Approval Only For The Intended Contract Purpose 11 3 All Material And Tools Brought In Shall Be Declared At Power Station Security Gate A Nd The List Of These Items Shall Be Signed By Dewa Security This Documents Including Delivery Note Will Be The Basis For The Qty 3Replacement Of Ng Train 22 Fiscal Metering To Gas Compressor Line Spoolpiece And Elbow And Main Filter To Condensate Tank Drain Line Elbow At MStation Jebel Ali For Queries Contact MrArvind Prakash 04 8161612 Arvind Prakash Dewa Gov AeStandard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail