Contract notice A680 Verfeil s Suspender 2 2 Paths Main Project ManagementHighways engineering servicesShort Description Principal project management and project management assistance for the design and construction of the 2 2 ways of the Verfeil s A680 ramp about 9 km long Including the enlargement of the existing section the creation of an exchanger in the municipality of Verfeil the creation of a new motorway section on a linear of about 1 5 km and the infrastructure upgrade existing This work on motorway infrastructure in service and on associated road infrastructure are indicative the following areas earthworks sanitation including basins roads road restraints horizontal and vertical signaling static and dynamic Articles of art acoustic protections hydraulic works watercouncing facilities for ecological continuity terrestrial and aquatic various operating equipment operating and energy networks Deadline for Submission 20210629 16 00Type of Buyer OtherType of Contract ServicesType of Procedure Restricted procedureRegulation European UnionType of Bid Submission for all lotsAward Criteria The most economic tender Disclaimer The above text is machine translated For accurate information kindly refer the original document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.