Tenders Are Invited For Procurement Installation And Commissioning Of Mechanical And Electrical Equipment For Eastern Sewage Treatment System Upgrading Project
Tenders Are Invited For Procurement Installation And Commissioning Of Mechanical And Electrical Equipment For Eastern Sewage Treatment System Upgrading Project
Project Name Procurement Installation And Commissioning Of Mechanical And Electrical Equipment For Eastern Sewage Treatment System Upgrading ProjectTenders Are Invited For In This Project The Existing Process In The Sewage Treatment Plant Is Upgraded And The Project Scale Is 100000 Tons Day The Main Process Of Sewage Treatment Remains Unchanged Adding Powdered Carbon Dosing Device Adding Sludge Drying Process After The Main Process Of Sludge Treatment Process Adopting Chemical Washing And Biological Filter Deodorization For Odor Treatment Process And The Designed Effluent Standard Meets The Requirements Of Existing Urban Sewage Treatment Plants Table 1 In Discharge Standard Of Main Water Pollutants For Urban Sewage Treatment Plants Db33 2169 2018 1 According To The Effluent Standard The Discharge Outlet Is Still The Original Shitangjiang Discharge Outlet And The Moisture Content Of Sludge Dewatering And Drying Is Below 40 The Total Land Area Of The Project Is 113712 6M2 And The Main Construction Contents Include A New Sludge Drying Machine Room And Power Transformation And Distribution Room A New Set Of Deodorization Device With Design Air Volume Of 20000M3 H The First Phase Biological Tank Is Covered With Glass Fiber Reinforced Plastic Arch Cover Plate Of 6000M2 And The First Phase Biological Tank Is Equipped With Two Sets Of Chemical Washing Biological Filter Deodorization Devices With Air Volume Of 16000M3 H And 22000M3 H Respectively H A New Powdered Activated Carbon Dosing Device With A Capacity Of 50M3 Was Built The Current Phase I Dehydration Room Was Reconstructed The Mud Cake Delivery Pump Was Replaced And The Mud Discharge Pipeline System Was Reconstructed The Elevation Of Phase I Secondary Sedimentation Tank Phase I Secondary Sedimentation Tank Distribution Well Phase I Biological Tank And Phase I Aerated Grit Chamber Were Reconstructed The Eastern Information Dispatching System Was Improved Products List 1 Procurement Installation And Commissioning Of Mechanical And Electrical Equipment For Eastern Sewage Treatment System Upgrading ProjectPlace Of Implementation Cixi Ningbo Zhejiang ChinaBeginning Of Selling Bidding Documents 2021 04 12Ending Of Selling Bidding Documents 2021 04 20Price Of Bidding Documents 2000 320Deadline For Submitting Bids Time Of Bid Opening Beijing Time 2021 05 07 10 00
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.