Usda Ars Pecan Orchard Fence

Tender Detail

37064265
12805B21Q0080
Self Funded
Usda Ars Pecan Orchard Fence
ICB
Northern America
Asia-Pacific Economic Cooperation, APEC,G20
12-02-2021

Work Detail

Statement Of Work 1 0 Contract Project A Project Number B Project Title Install Fencing Around Pecan Orchard Plot At The Usda Ars Southern Plains Agricultural Research Center Somerville Texas C Asset Number New Structure 2 0 Project Contact Persons A Contracting Officer Co As Assigned Usda Ars Pa Address City State Zip Phone B Research Program Representatives Rpr Dr G Wayne Ivie Usda Ars Pa Southern Plains Agricultural Research Center 2881 F Amp B Road College Station Texas 77845 Phone 979 260 9372 Fax 979 260 9377 C Location Administrative Officer Rhonda Korger Usda Ars Pa Southern Plains Agricultural Research Center 2881 F Amp B Road College Station Texas 77845 Phone 979 260 9372 Fax 979 260 9377 2 D Facility Manager Mark Buxkemper Lsm Cor Usda Ars Pa 2881 F Amp B Road College Station Texas 77845 Phone 979 260 9262 Fax 979 260 9377 3 0 Scope Of Services The Contractor Shall Provide All Professional Services Necessary For The Accomplishment Of The Contract Project And Such Required Services Shall Be In Accordance With Requirements As Described Herein A The Contractor Shall Provide Services For The Following Tasks Marked By An X X Provide And Install All Material To Complete The Project As Per Project Requirements 4 0 Project Requirements A The Contractor Shall Furnish A Cost Proposal To Provide Services To Provide And Install Fencing Around Designated Pecan Orchard Plot At The Somerville Tx Pecan Site B The Contractor Will Provide A Turnkey Product To Include But Not Limited To All Materials As Specified And The Proper Installation Of All Material The Project Is Located At The Southern Plains Agricultural Research Center Pecan Station Located At 10200 Fm 50 Somerville Texas C The Contractor Will Coordinate All Work With Site Personnel To Ensure The Construction Has As Little Impact As Possible To The Research Program D The Contractor S Work Shall Adhere To The Criteria Stated Within These Project Requirements Drawings And Specifications All Construction Shall Comply With Applicable Federal State And Local Code Requirements As Well As Current Industry Standards Ie Ubc Upc Nfpa Ul Astm Aci Nec Nema Etc And Health And Safety Codes In Effect At The Time Of Contract Award E Davis Bacon Wage Rates Apply To All Construction Contracts In Excess Of 2 000 Employee Payroll Logs For The Project Will Be Required To Verify Wage Rates Are Being Adhered To F Projects In Excess Of 35 000 Will Require Payment And Performance Obtaining And The Cost Of These Bonds Is The Responsibility Of The Contractor G All Work Is To Be Performed During Normal Business Hours H Contractor Is Required To Have An Active Registration In The Government S System Award Management Sam For The Bid To Be Accepted I The Contractor Will Be Required To Register In Government S Invoice Payment Platform Ipp And Submit Invoice Electronically For Payment 4 1 Base Bid A The Contractor Will Provide A Turnkey Project Satisfying All Local And State Requirements B The Contractor Is Responsible For Visiting The Site To Properly Assess Site Area Where Fencing Will Be Installed Figures 1 And 2 Provide Aerial View Of New Fencing Location C The Contractor Will Install New Fencing As Detailed In Figures 3 And 4 1 9 49 9 12 5 Solid Lock Netwire 4 Tall Along The Bottom 4 Feet Of The Fence 2 One Strand Of 4 Point Gaucho Barbed Wire Along Of The Fence 3 5 Strands Of 12 Gauge Hi Tensile Electric Wire Above The Netwire Spaced As Shown On Figure 4 Insulator To Be Used Electric Fence To Be Powered By Solar Powered Fence Charger Provided By Government Contractor Is Responsible For Supplying And Installing All Other Necessary Material Such As Grounding Rods And Cables To Make The System Operational 4 Bracing At Each Corner Post As Shown In Figure 4 All Metal Post To Be Capped 5 All Corner Posts To Be 14 Long 27 8 Diameter Post A Minimum 8 Diameter Hole Will Be Drilled 6 Deep For Each Post Corner Posts Will Then Be Driven In Ground To Achieve An Above Ground Height Of 8 With The Hole Filled With Sakcrete To Anchor The Post All Other Post For Corner Bracing To Be Set In 6 Deep Hole And Anchored In Concrete 6 T Posts To Be Driven In The Ground To Achieve Proper Above Ground Height 7 T Posts To Be Spaced At 10 Intervals With Alternating Posts 6 6 X 1 33 And 10 X 1 33 8 Two Bullmaster Gates Will Be Provided By The Government The Contractor Will Tack Weld Sheep And Goat Panels 4X4x48 To Each Gate The Contractor Will Provide All Hardware To Install Each Gate To A Include A 3 Wheel For Easy Of Opening And Support D The Contractor Is Responsible For Visiting The Site Prior To Submitting A Bid To Observe Existing Conditions No Compensation Will Be Provided For Conditions That Would Be Visible During An On Site Visit For Persons Experienced Performing This Type Of Work E Contact Mark Buxkemper At Mark Buxkemper Usda Gov To Schedule A Site Vist Due To Covid 19 All Safety Protocols Must Be Followed 4 2 Add Alternate A None 4 3 Government Furnished Equipment Services A The Government Will Provide A Solar Powered Fence Charger For Installation B The Government Will Furnish 2 Bullmaster Gates The Contractor Is Responsible For Mounting Panels To The Gates And Installation 5 0 General Requirements 5 1 Permits Where Governing Regulations And Imposed Codes And Standards Require Notices Permits Licenses Inspections Tests And Similar Items Or Actions In Order To Lawfully Proceed With The Required Work The Contractor Shall Obtain Items And Take Those Actions In Accordance With The Regulations Of The Governing Authority The Costs Of Such Permits Licenses Inspections Etc Are The Obligation Of The Contractor 5 2 Installation It Shall Be The Responsibility Of The Contractor To Complete Work In Accordance With The Manufacturer S Recommendations And Industry Standards Additional Procedures And Materials May Be Required Than Is Indicated Herein If Any Item Specified Herein Conflicts With The Applicable Codes And Recommendations The Contractor Shall Bring It To The Attention Of The Contracting Officer Representative For Immediate Resolution 5 3 Submittals Provide Manufacturer S Descriptive Literature Shop Drawings For All Materials To The Lsm Cor For Review The Descriptive Literature Shall Be Annotated Highlighted To Show Its Conformance With Contract Requirements Submittals Are Required For Windows And Glass And Will Be Stamped And Orsigned By The General Contractor Prior To Submission To The Government Electronic Submittal Is Preferred 5 4 Quality Control The Work Performed Under This Contract Shall Be Subject To Continuous Audit By The Lsm Cor Quality Control Is The Exclusive Responsibility Of The Contractor 5 5 Protection Of Work And Property Safety Requirements A The Contractor Shall Protect The Work The Site And All Existing Property And Structures Within The Limits Of The Construction Activities Or That May Beaffected Thereby Until Acceptance Of The Work Any Damage To Property Shall Be Repaired At The Contractor S Expense To Pre Damaged Condition To The Satisfaction Of The Lsm Cor B Safety And Health Matters As They Relate To The Work Are The Exclusive Responsibility Of The Contractor The Contractor Shall Furnish Erect And Maintain Barricades Warning Lights Signs Guards Or Take Other Precautions As May Be Required By Law Or Local Authorities Of The Protection And Security C Contractor Is Responsible For Verifying Location Of Any Underground Utility And Is Responsible For Any Damaged Caused To Such Utilities D Contractor Shall Furnish A Site Specific Safety Plan Sssp Or Accident Prevention Plan App 10 Days After Contract Award Sssp App Shall Be Approved By The Government Before Construction Work Commences 5 6 Temporary Facilities A Temporary Utilities Water And Electricity May Be Furnished To The Contractor By The Government If So Requested However The Utilities Are Only Available At The Main Site The Contractor Is Responsible For Routing Them To The Job Site As They May Require The Contractor Shall Maintain And Protect All Such Utilities During The Course Of Construction And Shall Repair Or Replace Any Items Damaged Through Its Own Negligence B Should The Contractor Require Any Power Or Utility Shutdowns During Construction The Contractor Shall Obtain Approval For Such Shutdown From The Cor Three Working Days Prior To The Need 5 7 Materials And Equipment A The Material And Equipment To Be Furnished Under These Contract Documents Shall Be The Standard Products Of Manufacturers Regularly Engaged In The Production Of Such Materials And Equipment And Shall Be The Manufacturer S Latest Standard Design B All Materials And Equipment To Be Incorporated In The Work Shall Be Handled And Stored By The Manufacturer Fabricator Supplies And Contractor Before During And After Shipment In A Manner To Prevent Warping Twisting Breaking Chipping Rusting And Any Injury Theft Or Damage Of Any Kind To The Materials And Equipment All Materials And Equipment Furnished By The Contractor Shall Be Subject To Inspection And Approval By The Co Cor 5 8 Cleanup The Construction Site Shall Be Kept Clean And Free Of Debris At All Times Upon Completion Of The Project And Prior To Final Inspection The Contractor Shall Remove From The Premises All Unused Material Trash And Debris Resulting For The Work To The Satisfaction Of The Cor 5 9 Warranty A Submit Data Concerning The Standard One Year Warranty For Workmanship Including The Warranty Periods Dates And Warranty Contacts With Names Addresses And Telephone Numbers B Extended Equipment Product Warranties None Required 5 10 Final Payment Contract Closeout The Following Submittals Are Required Prior To Final Payment Other Documents May Also Be Required A General Contractors One 1 Year Warranty On Work B Release Of Liens C Employee Payroll Time Sheets D Ars Forms 371 And 372 E Invoice 6 0 Project Schedule The Contract Time For This Project Is 90 Calendar Days Figure 1 Site Location Of New Fencing North Corner Of Orchard 30 511782 And 96 434078 Figure 2 Fencing Area Expanded View Figure 3 Area To Be Fenced Figure 4 Fencing Design

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail