Tenders Are Invited For Budapest Capital Xiv To Perform Construction And Building Type Renovation And Maintenance Works Of Various Structures Owned Maintained Or Managed By The Local Government Of The District

Tender Detail

36676556
2021 S 015 030423
Self Funded
Tenders Are Invited For Budapest Capital Xiv To Perform Construction And Building Type Renovation And Maintenance Works Of Various Structures Owned Maintained Or Managed By The Local Government Of The District
ICB
Eastern Europe
European Union
29-04-2021

Work Detail

Modification Of A Contract Concession During Its Term Budapest Capital Xiv To Perform Construction And Building Type Renovation And Maintenance Works Of Various Structures Owned Maintained Or Managed By The Local Government Of The DistrictWorks For Complete Or Part Construction And Civil Engineering WorkShort Description Framework Agreement On The Xiv To Perform Construction And Renovation And Maintenance Works Of Various Constructions Owned Maintained Or Managed By The District Municipality In Accordance With The Conditions Specified In The Framework Agreement And The Specific Contracts For The Specific Work Together With The Provision Of Additional Planning Permitting Services 3 The Technical Content Of Individual Contracts For A Specific Work Cannot Be Determined In Advance It Always Depends On The Need To Procure The Scope Of Work To Be Performed Typically But Not Exclusively Includes The Performance Of Various And Related Works On Public Roads Sidewalks Pavements Various Utilities Green Areas The Value Of Individual Contracts Cannot Be Determined In Advance However The Total Value Of Individual Contracts Is On The Forecast An Average Net Huf 500 000 000 Per Year The Framework Agreement Is Not Specified In Terms Of Financial Resources The Contractor As The Contractor Shall Unless Otherwise Specified By The Contracting Authority Carry Out On Site Quality Assurance During Implementation In Particular But Not Limited To Preliminary Quality Planning Quality Training Continuous Quality Control During Construction Finishing Quality For Each Part After Completion Checking Quality Coordination Of Successive Parts Of Work Quality Control And Documentation Of Materials Used In Order To Perform The Tasks The Contractor Shall Where Appropriate In Particular But Not Exclusively In The Event Of Troubleshooting Requiring Immediate Intervention Be Obliged To Work Without Delay On Saturdays Sundays Public Holidays Or At Night The Tenderer May Not Claim Any Additional Fees Or Costs In The Case Of Saturdays Sundays Public Holidays Nights And Extraordinary Work Incurred In Order To Perform This Category In The Case Of Work Which Typically Requires Immediate Intervention For Emergency Response Or Crisis Response A Maximum Of 24 Hours May Elapse Between The Ordering Of The Work And The Response Thus Increasing The Availability Of The Contractor Maintaining The Appropriate Technical Background During The Framework Agreement To Be Concluded Expectation The Contractual Deadline For Individual Works Not Included In This Category Will Typically Be 1 3 Months The Specificity Of The Contracting Authority And The Place Of Performance Is That In The Performance Of The Task The Maintenance Of The Uninterrupted Flow Of Traffic And The Maintenance Of The Public Service During The Execution Must Be Ensured Where Appropriate Full Accessibility Of Some Of The Structures Involved In The Task Where Appropriate Is An Expectation On The Part Of The Contracting Authority During The Term Of The Framework Agreement The Contractor Must Not Only Carry Out The Work Under The Individual Contracts But Must Also Be Available At All Times During The Long Term Relationship With The Contracting Authority To Carry Out Specific Work With An Unforeseen Unscheduled Quantity And Duration During The Term Of The Framework Agreement The Contracting Authority May Be Able To Meet Several Simultaneous Procurement Needs Of The Contracting Authority Thus Obliging It To Work In Parallel To Submit Several Individual Tenders At The Same Time And Or To Coordinate The Execution Of Works At The Same Time In The Absence Of This The Contracting Authoritys Multiple Procurement Needs Could Not Be Met In A Flexible And Timely Manner Without Delay The Number Of Individual Works Is Expected To Be At Least 250 300 During The Duration Of The Framework Agreement Among The Maintenance Works The Asphalting And Troubleshooting Works Requiring Immediate Intervention Are Related To A Total Of Nearly 1 000 000 Nm Of Road And 540 000 Nm Of Pavement Surface Type Of Buyer Regional Or Local Agency OfficeType Of Contract WorksType Of Procedure Open ProcedureRegulation European Union With Participation By Gpa CountriesType Of Bid Not ApplicableAward Criteria Not Applicable Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail