Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN
04-11-2020
Work Detail
Procurement Plan For Planning For The School Of Information Officers School Hall Building Project ContractorDate Approval 04 08 2020Package 1Type ConsultancyName Design Consulting Construction Drawings Making Total Cost EstimatesPrice 880 984 000Package 2Type ConsultancyName Drilling For Engineering Geological SurveyPrice 146 073 000Package 3Type ConsultancyName Consultant To Verify Construction Drawing Design Documents Cost EstimatesPrice 118 915 000Package 4Type ConsultancyName Consulting On Setting Up Bidding Documents Evaluating BidsPrice 116 584 000Package 5Type WorksName Prevention Of Termites WorksPrice 271 000 000Package 6Type GoodsName Supply And Install The Air Conditioning SystemPrice 1 700 000 000Package 7Type GoodsName Construction Supply And Installation Of Fire Protection System EquipmentPrice 779 815 000Package 8Type GoodsName Construction Supply And Installation Of Sound System Equipment Hall LightPrice 2 500 000 000Package 9Type GoodsName Supply And Install The Furniture Of The Joint Venture And The Hall Price 3 400 000 000Package 10Type WorksName Building Hall Technical Infrastructure Outside The HousePrice 27 032 800 000 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.