Ca Yose 17 4 Amp 941 1 Tioga Road Amp Tuolumne Meadows Amp Tenaya Lake Parking

Tender Detail

31546630
6982AF20B000013
Self Funded
Ca Yose 17 4 Amp 941 1 Tioga Road Amp Tuolumne Meadows Amp Tenaya Lake Parking
ICB
Northern America
Asia-Pacific Economic Cooperation, APEC,G20
06-07-2020

Work Detail

This Is A Presolicitation Notice Plans And Specifications Are Currently Not Available Ca Yose 17 4 Amp 941 1 Tioga Road Amp Tuolumne Meadows Amp Tenaya Lake Parking Project Details This Project Will Consist Of Roadway Resurfacing Restoration And Rehabilitation Of 12 Miles Of Tioga Pass Road Including Eliminating Off Road Shoulder Parking And Reconfiguring Expanding Parking Areas Within The Tuolumne Meadows And Tenaya Lake Areas To Improve The Safety Of Pedestrians And Drivers Within Yosemite National Park Ca The Project Includes Work At 12 Parking Sites Within Tuolumne Meadows 4 Parking Areas At Tenaya Lake And Heavy Maintenance Repairs To The Tuolumne River Bridge The Tuolumne Meadows Area Of The Park Experiences High Visitation Which Is Estimated At Over 600 000 Visitors Per Year All Occurring During The Open Period From Late Spring Through Summer The Terrain Is Mountainous With The Elevation For The Work Ranging Between 8 200 And 9 200 Feet Tioga Road Is Typically Closed Throughout The Project Limits From October To May Due To Heavy Winter Spring Snowfall And Avalanche Hazards See Website Below For Historical Seasonal Opening And Closing Dates Https Www Nps Gov Yose Planyourvisit Seasonal Htm The Estimated Price Range Is Between 25 000 000 And 35 000 000 The Anticipated Advertisement Date For The Project Is July 2020 With Construction Anticipated From August 2020 To October 2022 This Project Increases The Existing Formal Parking Supply In Tuolumne Meadows Through Reconfiguration And Expansion Of Existing Parking Lots And Formalization Of Parking Along The Stables Road Off Road Shoulder Parking Along Tioga Road In The Vicinity Of The Existing Visitor Center And Cathedral Lake Trailhead Will Be Removed After The Expanded Parking Is Constructed This Project Also Addresses Roadside Parking Congestion And Visitor Safety In The Tenaya Lake Area Through Reconfiguration Of 4 Existing Parking Lots Removal Or Formalization Of Roadside Parking Installation Of Crosswalks And Sidewalk Improvements All Of The Work Is Occurring In Cultural And Natural Resource Sensitive Areas And There Are Numerous Environmental Constraints That Will Affect The Construction Schedule And Type Of Operations Great Attention To Detail Will Be Required In Achieving Customer Satisfaction In Areas Of Road Construction Traffic Control Visitor Relations And Timely Completion Of Work Prior Experience On Projects Of Similar Magnitude Within National Parks Is Required Principle Work Items Include 40 000 Tons Of Asphalt Concrete Pavement Gyratory Mix 42 000 Linear Feet Of Concrete Curb 18 000 Tons Of Aggregate Base 11 000 Tons Of Surface Course Aggregate 3 000 Linear Feet Of Metal Pipe Culverts 3 000 Cubic Yards Of Rock Excavation 4 000 Cubic Yards Of Subexcavation Utility Relocations Including Electrical Telephone Water 12 Miles Of Full Depth Reclamation 5 000 Cubic Yards Of Unclassified Borrow 8 000 Cubic Yards Of Roadway Excavation 2 500 Square Yards Of Concrete Sidewalk And 1 000 Square Feet Of Rockery Wall This Will Be A Full And Open Competition

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail