Contract notice Offshore ServicesHessel Offshore Wind Farm Floating Lidar MeasurementsDescription A Floating LiDAR buoy shall be deployed in the Hessel off shore Wind Farm area more than 30 kilometers north of the coast of Zealand The LiDAR buoy shall measure 12 months of wind speed and direction Also oceanographic data waves sea current water level shall be measured in the same location either by the same Floating LiDAR system or by another measuring system A third party technical note on the expected validity reliability and bank ability of the measurement data shall be delivered together with the measurement data The measuring data must be available for the client on electronic form FTP server or online website on a daily basis Time limit for receipt of tenders or requests to participate Date 11 08 2020 Local time 12 00
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.