With the present procedure TP SFE Alabak aims to assign a specific contractor to maintain the existing 5545 l m mineralized strips with a width of 2 m on an area of 546 decares
With the present procedure TP SFE Alabak aims to assign a specific contractor to maintain the existing 5545 l m mineralized strips with a width of 2 m on an area of 546 decares
With The Present Procedure Tp Sfe Alabak Aims To Assign A Specific Contractor To Maintain The Existing 5545 L M Mineralized Strips With A Width Of 2 M On An Area Of 546 Decares
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.