Adjusting and Supplementing the Quality Control Plan for the Xl3 Package Technical Infrastructure Phase 3 and Embankment along Vam Co River Bank Infrastructure Project in the Political Administrative Center of the Province
Adjusting and Supplementing the Quality Control Plan for the Xl3 Package Technical Infrastructure Phase 3 and Embankment along Vam Co River Bank Infrastructure Project in the Political Administrative Center of the Province
Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN
22-08-2020
Work Detail
Procurement Plan for Adjusting and Supplementing the Quality Control Plan for the Xl3 Package Technical Infrastructure Phase 3 and Embankment along Vam Co River Bank Infrastructure Project in the Political Administrative Center of the ProvinceDate Approval 22 05 2020Package 1Type WorksName 8A Construction and Installation Package 3 Technical infrastructure phase 3 and embankments along the riverbank and grassPrice 47 843 778 000Package 2Type WorksName 8B Square to arrange Fair Center Exhibition Center provisional Price 8 971 614 000Package 3Type ConsultancyName ValuationPrice 21 452 000Package 4Type ConsultancyName Verifying the design of construction drawings and cost estimates Square to arrange the center of the Fair Exhibition temporary Price 33 295 000 Disclaimer The above text is machine translated For accurate information kindly refer the original document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.