Update Zeda Ru On Farm Network RehabilitationThe Ministry Of Environmental Protection And Agriculture Of Georgia Now Invites Sealed Bids From Eligible Bidders For Zeda Ru On Farm Network Rehabilitation Construction Period Is 18 Months The Site Is Located In Shida Kartli Region Area Of Gori And Kareli Municipalities Approximately 100 Km From Tbilisi The Project Serves To Irrigate 2 400 Ha The Works Include The Construction Of Network With Polyethylene Pipelines Diameter 100 To 600 Mm With A Total Length Of 53 Km Arrangement Of Closed Irrigation System With Hydrants Low And High Pressure Vents Dispensing Wells And Protective Structures At The End Of Each Dispenser For Irrigation Network Concrete Rectangular Cross Section Channel In Different Dimensions From 0 5X0 5 To 1 4X1 4 Meters With A Total Length Of Approximately 27 Km Arrangement Of Setting Basins At The Beginning Of Main Canal On The Main Canal And On The Open Channel Of The Dispenser Are Outlet Check Structure Culverts Small Bridges For Pedestrians And Vehicles Water Meters Flashing Structure And Drop Structure This Notice Was Posted On 24 April 2020 And Has Been Updated On 29 Of May Please Note That The Deadline Has Changed From 27 May To 10 June 2020
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.