Installation Roof Requirement

Tender Detail

29537355
W91QF4 20 B 0002
Self Funded
Installation Roof Requirement
ICB
Northern America
Asia-Pacific Economic Cooperation, APEC,G20
13-05-2020

Work Detail

This Posted Announcement Is A Solicitation Synopsis Of A Proposed Contract Action In Accordance With Far Subpart 5 207 The Mission Installation Contracting Command Fort Leavenworth Intends To Issue An Invitation For Bid Ifb For A Requirements Type Contract Far Subpart 16 503 For The Acquisition Of Roofing Services Supporting Sustainment Restoration And Maintenance Srm At Fort Leavenworth Kansas The Project Is To Repair And Or Replace The Existing Roofing Systems On Various Oma Buildings Throughout The Post This Work Will Include The Removal And Disposal Of The Existing Roof Systems Including Flashing Down To The Structural Roof Deck Repairing The Roof Deck If Required Installing New Flashing And Roof System It Will Also Include Repairs To Gutters Fascia Downspouts And Incidental Trim And Painting The Work To Be Performed Includes The Following Principal Features A All Buildings Will Be Occupied During Construction B Some Of The Existing Paint Contains Lead Lead Based Paint Is To Be Handled As Described In Attached Specifications C The Buildings Are A Mixture Of Historic And Non Historic Buildings Some Details Of Historic Buildings Will Have To Be Approved By The State Of Kansas State Historic Preservation Office Shpo D The Types Of Roofing Repairs Or Replacements We Could Have During The Performance Of This Contract Are As Follows 1 Three Tab Asphalt Shingle Roofing Standard And Architectural Shingles 2 Modified Bitumen Roofing 3 Epdm Roofing Removed And Replaced With Modified Bitumen 4 Slate Roofing Repair Or Replacing An Existing Asphalt Shingle Roof With Slate Roofing 5 Metal Roofing Repair Or Replacement 6 Use Of Cool Roof Technology 7 Epdm Roofing Repair Or Replacement E Some Of The Buildings May Require Additional Repairs In Areas Related To The Roof Such As The Following 1 Replacement Repair Or Painting Of The Gutters And Downspouts 2 Replacement Or Repair Of Some Of The Rotted Substrate Including Rafters Anddecking 3 Tuck Pointing Masonry Chimneys Parapets And Other Masonryelements Above The Roof Line For The Proper Application Of Flashing Orcounter Flashing To Ensure The Water Tight Integrity Of The Building 4 Replacement Repair Or Painting Of The Fascia Soffit Frieze Boards And Trim 5 Replacement Repair Or Painting Of Soffit Vents Roof Vents And Ridge Vents 6 Replacement Of Blanket And Blown In Insulation 7 Replacement Or Repair Of Some Portions Of Epdm Roofing Systems 8 Replacement Or Repair Of Some Portions Of Elastomeric Joint Sealants 9 Identification Of Subsurface Moisture Problems Locations In Existing Roofs F Refer To Attached Specifications For Additional Information Work Shall Be Completed In Accordance With All Current Codes Regulations And Related Addenda Including All Local County State And Federal Agencies Having Jurisdiction Over Any Portion Of The Work To Be Performed Under This Contract In The Event Of Conflicting Guidance The More Stringent Guidance Will Be Followed This Includes But Is Not Limited To A Unified Facilities Criteria Ufc Namely For Buildings And Security Requirements Ufc 3 110 03 Roofing Ufc 3 110 04 Roofing Maintenance And Repair B International Building Codes Ibc Ipc Imc C National Fire Protection Association Nfpa D American National Standards Institute Ansi All Will Be In Accordance With Individual Task Order Requirements Specifications And Drawings Provided With Each Project And Or Master Specifications The North American Industry Classification System Naics Code For This Work Is 238160 Roofing Contractors The Small Business Size Standard Is 16 5 Million Average Annual Revenue For The Previous Three Years This Requirement Will Be A Total Small Business Set Aside Procured Utilizing Sealed Bidding Procedures Specified In Far Part 14 The Government Anticipates An Award Will Be Made To A Responsible Bidder Whose Bid Conforming To The Invitation For Bids Will Be Most Advantageous To The Government Considering Only Price And The Price Related Factors Included In The Invitation This Anticipated Contract Will Consist Of A Base Award Period Of One 1 Calendar Year And Two 2 One Year Option Periods Total Contract Period To Include Options Shall Not Exceed Three 3 Calendar Years Task Orders Will Range From 2 500 00 To 300 000 00 The Total Of Individual Task Orders Placed Against This Contract Shall Not Exceed 7 000 000 00 There Will Not Be An Organized Group Site Visit Pre Proposal Conference Due To The Covid 19 However Site Visits Will Be Scheduled On A Request Only Basis Beginning Monday 6 10 April 2020 At Time Amp Location Tbd On Fort Leavenworth Ks Interested Contractors Are Encouraged To Contact Mr Alphonso Barnes Via E Mail At Usarmy Leavenworth Accmicc Mbx Construction Mail Mil 48 Hours Prior To Requested Visit For Coordination With The Dpw Project Manager And Inspector Due To Limited Space Each Firm Has A Limit Of Two Personnel For Attendance Attachments To This Solicitation Synopsis Includes The Invitation For Bid Ifb And Applicable Attachments

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail