Expressions Of Interest For Consultancy Services Corridor Vc Doboj Bypass ProjectThe Expected Outcome Of The Assignment Is Engaging Consultants To Assist In Works SupervisionFor The Design And Construction Of 5 6 Km Of New Motorway Including AllRelated Local Roads And Following Major Structures Dual TubeTunnel Putnikovo Brdo 1 In Total Length Of 1 6 Km Dual TubeTunnel Putnikovo Brdo 2 In Total Length Of 700M This Section IncludesThe Last 150 Metres Of The Tunnel That Are Located Within The Fbih Plus Cca 200M After The Tunnel Bridge Rudanka Over River Bosna Viaduct Putnikovo Brdo
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.