Mechanical Engineering Installation WorksUniversity Of W rzburg Hubland S d Campus Center For Sustainable Chemistry And Catalysis With Boron New Icb Building Gwa Installation SanitaryDescription 1 000 M Drinking Water Network Including Pressure Booster System Multi Layer Composite Pipe Stainless Steel 600 M Non Drinking Water Network Indirect Connection Cat 5 With Pressure Booster System Multi Layer Composite Pipe Stainless Steel 690 M Pressure Booster System 2 Stage Water Treatment System Supply Via Soft Water Campus Network For Exhaust Air Humidification Osmosis Water And Laboratory Supply Demineralized Water Pp And Stainless Steel 700 M Pe Hd Sml Kml Wastewater Network And Laboratory Wastewater Network Each With A Lifting System Inventory Collecting Tank With Pressure Increase For The Return Of Laboratory Wastewater To A Laboratory Wastewater Network In The Annex 250 M Pe Hd Sml Free Level Rain Drainage 130 M Galvanized Steel 2 Dry Risers Sanitary Equipment Including Connections Outside The Laboratory Area Time Limit For Receipt Of Tenders Or Requests To Participate Date 12 02 2020 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.