Request For Proposals For Karori Normal School Redevelopment Project Master Plan Lead Design Services

Tender Detail

22451994
CW2019 058 MOE00255
Self Funded
Request For Proposals For Karori Normal School Redevelopment Project Master Plan Lead Design Services
NCB
Australia and New Zealand
Asia-Pacific Economic Cooperation, APEC
27-09-2019

Work Detail

Request For Proposals Rfp For Cw2019 058 Karori Normal School Redevelopment Project Master Plan Lead Design Services Open Date Tuesday 3 September 2019 9 00 Am Pacific Auckland Utc 12 00 Close Date Friday 27 September 2019 5 00 Pm Pacific Auckland Utc 12 00 Tender Type Request For Proposals Rfp Tender Coverage Sole AgencyRegions WellingtonRequired Pre Qualifications NoneOverview This Request For Proposals Rfp Issued By The Ministry Of Education The Ministry The Principal To The Contract Is An Open Invitation To Design Consultants Tenderers To Submit A Proposal For Karori Normal School The School Redevelopment Project Master Planning And Lead Design Services The Services The Ministry Will Hold 1 Compulsory Site Visit For All Tenderers Karori Normal School Is A Large Primary School 703 Students That Has Been Identified As A Priority For Redevelopment Four Of Its Buildings Are Leaking And These Contain More Than Half Of The 32 Classrooms And Library Block F Has Had To Be Isolated Since 2017 Due To Weather Tightness Related Air Quality Issues Block F Block 1 And Block 2 Are Leaking Due To Their Age And Condition While Block G Was Built In The 1990S And Is Affected By Systematic Weather Tightness Failure The Project Scope Outlined Demolish Block F Roof And Internal Gutters Have Failed Which Has Resulted In Significant Damage To The BuildingS Interior And Probable Damage To Timber Framing Demolish Library Part Of Block 1 Although In Good Condition The Library Is 114M2 Larger Than Entitlement Repair And Refurbish Including Minor Remodelling Blocks 1 2 And G To Provide Additional Teaching Spaces Build An Extension To Existing Hall Building That Increases Hall Space And Provides Library And Teaching Space To Schools Entitlement Repair Replace Corroded Steel Formwork Beneath Block H Elevated Walkway Repair The Retaining Wall Behind Blocks 1 CThe Desired Outcome S Being Sought Are All Known Weather Tightness Issues Would Have Been Addressed Retaining Wall Has Been Repaired And No Longer Poses A Risk The School Has 34 Classrooms And Achieve Its Net And Gross Spg Entitlements

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail