Expression of Interest For Recruitment Of Unbu Studies Of Studies For The Monitoring And Control Of The Definitive Construction Works

Tender Detail

21907433
GA CN TIPPEE 123362 CS CQS
Self Funded
Expression of Interest For Recruitment Of Unbu Studies Of Studies For The Monitoring And Control Of The Definitive Construction Works
ICB
Central Africa
African Solidarity Fund (FSA)
27-08-2019

Work Detail

Request For Expression Of Interest For Recruitment Of Unbu Studies Of Studies For The Monitoring And Control Of The Definitive Construction Works Of A Terrestrian Channel Extending A Length Of 1 100 Ml In Port Gentil In The Balise Area In A Single Lot Distributed In Three 3 Sections Section 1 166 Ml Section 2 394 Ml And Section 3 537 Ml Procurement Method Selection Based On Consultants QualificationNotice No Op00075840 Notice To Expression Of Interest For The Recruitment Of Unbu Studies Of Studies For The Monitoring And Control Of The Definitive Construction Works Of A Terrestrian Channel Extending A Length Of 1 100 Ml In Port Gentil In The Balise Area In A Single Lot Distributed In Three 3 Sections Section 1 166 Ml Section 2 394 Ml And Section 3 537 Ml Td Style Height 8 75Pt Vertical Align Top Width 83 796875Px Date Of Publication P Identification BackgroundThe Gabonese Government Is Proposing To Finance With The Support Of The World Bank A Local Development Project Called The Local Infrastructure Development Project Pdil A First Phase Of Which Has Already Been Financed Between 2006 And 2011 The Project Is Implemented In The Framework Of A Program Called Public Interest Works For The Promotion Of Entrepreneurship And Employment Tippee The Tippees Were Set Up By The Government To Improve 1 The Access Of Populations From Sub Integrated Neighborhoods To Basic Services And 2 The Sustainable Access Of Smes To Civil Works Contracts And Of Construction The Permanent Secretariat Sp Of The National Commission For Tippee Executing Agency Proposes To Use Part Of The Loan Funds To Carry Out Urban Road And Drainage Works This Work Will Be Carried Out By Local Small And Medium Sized Enterprises Smes Using Labor Intensive Methods Of Labor Based Himo The Coordination Monitoring Control And Supervision Of This Work Will Be Entrusted To The Serious Design Offices The Present Reference Terms Consist In Defining The Complete Mission Of The Service Provider For Monitoring And Control Quality And Quantity Control Of The Definitive Development Of An Existing 100 M Long Earth Canal In Port Gentil In The Quartierbalise In A Single Lot Divided Into Three 03 Sections In This Notice The Client Means The State And The Municipalities Represented By The Permanent Secretariat That Is To Say The Party That Engages The Supervisor To Carry Out The Control Monitoring Coordination And Supervision Of The Work The Project Manager Designates The Design Office That Will Be Retained At The End Of This Consultation Concerning The Supervision And The Control Of The Works On Behalf Of The Owner Definition Of The Mission The Mission Will Include Two 02 Tranches 1 Tranche 1 Control Monitoring Coordination And Monitoring Of WorksIt Takes Into Account The Previous Operations Aagrav Surve The Execution Of The Works Which Consist In The Examination Of The Conformity To The Project Visades And Projects Of Execution Then The Control The Supervision The Coordination The Administrative And Financial Follow Up Of The Works Of Definitive Development Of The Existing Canal In This Respect The Project Manager Will Be Responsible For The Strict Respect Of The General Planning Of The Works As Well As For The Delays In Approving And Receiving Project Execution Work In The Municipality Of Port Gentil In The Balise District For The Lot Only In Three 3 Sections Below Section 1 166 Ml Section 2 394 Ml Section 3 537Ml It Shall Also Ensure That The Quality Of The Work From The Technical Point Of View Is In Accordance With The Provisions Of The Companys Contracts Assistance To The Manager Of Implementation In The Drafting Of Proposals For Riders To The Market Basic Contractor Assistance To The Owner In Estimating The Financial And Contractual Impact Of Modifications To The Works In The Follow Up Mission Of The Deadlines Provision Of The Sites Of The Works Requested Assistance To The Companies In The Establishment Of A Quality Self Control Qol And A Hygiene Safety Environment Plan Phse On A Practical Level During The Works The Master Of Work Ensures Li Continuous Monitoring Of The Work Through A Designated Site Supervisor Who Is A Permanent Representative In The Field The Weekly Site Visit With The Representative Of The Company To Identify The Difficulties Encountered Control The Quality Of Work And Measure The Quantities Of Works Made According To The Price Schedule For Payment And Give All Instructions Necessary To Ensure The Effectiveness Of The Continuation Of The Works To Make An Account Of The Visit Which Will Be Recorded In A Site Monitoring Booklet Kept For That Purpose And Intended To Verify The Conformity Of The Application Of The Recommendations The Control And Letting Of Accounts And The Visa Of The Payment Certificate AndTo Be The Permanent Interlocutor Of The Company For Any Question Relating To The Execution Of The Works The Project Manager Will Assist Smes As Much As Necessary In The Planning And Scheduling Of The Final Layout Of The Existing Canal And Assist Them In Resolving Any Technical Issues That May Arise During The Course Of The Project The Realization Of Said Works In Particular He Must Ensure The Regularity Of Construction Site Approvisi Ons During His Mission The Project Manager Will Have To Identify All The Technical Organizational And Operational Or Administrative Insufficiencies Of Smes That He Will Find In Order To Propose To The Client A Suitable Training Program For Smes 2 Tranche 2 Temporary Acceptance Of OperationsThe Project Manager Shall Assist The Owner Of The Work In The Provisional Acceptance Of The Works He Must Therefore Write A Report Of Receipt Of Works He Must Also Verify And Approve The Plans For The Proofing Of The Works Received In A Definitive Manner Definition Of Projects The Main Objective Of This Work Is The Improvement Of The Sanitation Of The Existing Earthen Canal By The Construction Of A Reinforced Concrete Canal At Port Gentil Particularly In The Balise District Using Technologies And Components That Minimize The Use Of Heavy Equipment In The Neighborhood Maximizes Their Effects On Low Skilled Employment In The Construction Sector In Terms Of Costs And Deadlines The Works Consist Mainly Of The Execution Of A Reinforced Concrete Canal The Cleaning Of Existing Connection Works Upstream And Downstream As Well As The Construction Of Reinforced Concrete Crossing Bridges The Mission Will Be Carried Out According To The Previously Defined Phases And Will Concern The City Of Port Gentil In The Local Development Plan Pdl R Aquo Namely Quality Control And The Quantities Of The Execution Works Of A Canal In Reinforced Concrete Of 1 100 Ml In The Communede Port Gentil Execution Works Will Include The Preparatory Earthworks The Realization Of The Reinforced Concrete Canal On Site The Construction Of Reinforced Concrete Walkways The Cleaning Of Existing Channels And Canals And The Possible Construction Of Earthen Ditches Other Works To Improve The Sanitation Of Local Residents And The Drainage System Of The Surrounding Roads Etc Qualification EtexperienceThe Commission National E Of Tippee Invites Firms Co Nsultants ligibles To Indicate Their Interest In Providing The Services Described Above Interested Consultants Must Provide Information Demonstrating That They Possess The Required Qualifications And Experience Relevant To The Performance Of Those Services The Control Office Should Have Five 5 Years Of Experience In The Field Of Engineering Studies And Monitoring Of Drainage Works Buildings Roads And Similar Access Roads The Environment And Economic Studies For This Project Project References Minimum 3 With Project Management Assignments For Similar Work AndA Certificate Goes Iso 9001 For The Design Of Public Works It Is Brought To The Attention Of The Consultants That The Provisions Of Paragraph 1 9 Of The Guidelines Selection And Employment Of Consultants By World Bank Developers In The Context Of Ibrd Loans And Ida Credits And Donations January 2011 Revised July 2014 Relating To World Bank Rules On Conflict Of Interest Consultants Can Partner With Other Firms To Strengthen Their Respective Competences In The Form Of A Solidarity Group Or A Sub Contractor Agreement Following The Expression Of Interest A Firm Firm Will Be Retained And Consummated From The Quality And Co Ordination Based Selection Process Sfqc In Accordance With The Procedures Set Out In The World Bank Borrowing Loans And Loans And Consultants Guidelines For The Selection And Use Of Consultants By The World Bank Borrowers Version Of January 2011 Revised Version Of July2014 Interested Consultants Can Obtain The Terms Of Reference Or Related Information Or 2014 Lacute Tional Mail Electronics Through Tippeegabon Fmbongo Cntippee Org Or Phone No 241 01 73 19 63 Or 04 12 45 45 At The Following Times 8 00 To 16 00 Heurelocale The Folds Shall Be Marked As Follows Manifestation Of Interest For The Recruitment Of An Office Of Studies For The Monitoring And Control Of Definitive Construction Works Of Uncanal In Land Existing With A Length Of 1 100 Ml In Port Ge Ntil In The Balise District In A Single Lot Distributed Entrois 3 Sections Section 1 166 Ml Section 2 394 Ml And Section 3 537 Ml Manifestations Of Interest Mi Written In French In Five 05 Copies One 1 Original And 4 Four Copies Must Be Deposited At The Address Below In Person And By Mail Or By Electronic Mail Followed By Acknowledgment Of Receipt At The Latest On August 27 2019 At 12H00 00 Permanent Secretariat Of The National Commission Of Tippee Sp Cntippee Address Gu Gu Bridge Impasse Andr Mba Obame Villan 117Bp 22 Libreville Gabon Tel 241 01 73 1963E Mail Tippeegabon Cntippee Org Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail