Tenders Are Invited For Economic Impact Assessment

Tender Detail

21331879
2019 S 136 336302
Self Funded
Tenders Are Invited For Economic Impact Assessment
ICB
Western Europe
06-09-2019

Work Detail

Contract Notice Economic Impact AssessmentCost Analyses And Rule ChangesDescription Development Of A Calculation Model Dibk Has Assessed That The Most Appropriate Calculation Method Is Calculation From Modelling Buildings I E An Analysis Of The Cost Effects Of Rule Changes Is Made By Modelling Different Types Of Buildings And The Costs Of Constructing Them Before And After The Rule Changes Simple And Representative Model Buildings Must Be Modelled For The Most Relevant Building Categories Dibk Has Used Models For 3 Different Buildings For Previous Reviews Including Energy Rules Small Houses Blocks Of Flats And Office Buildings We Would Also Like To Use The Same 3 Building Categories In This Project Dibk Has Used Building Models That Are A Modification Of Sintefs Building Models For Previous Cost Calculations Of Changes To Energy Rules Furthermore We Have Used A Model That Was Developed For Dibk Dibk Blokka This Is A Further Development Of Uu Blokka Which Amongst Other Things Is Used To Calculate The Costs Of Changes In Availability And Universal Design Requirements Dibk Has Specifications For These Building Models Further Development Of Dibk Blokka Is Included In The Project Dibk Has Not Developed Its Own Models For Small Houses And Office Blocks Other Than The Sintef Models These Must Therefore Be Developed In The Project It Must Be Possible To Put Small House Models Together To Form Terraced Houses The Models For The 3 Building Categories Must Be Built Up In Accordance With The Specifications That Apply In The Current Tek Requirements So That They Fulfil The Rules And So That Over Time It Is Possible To Follow Changes In Construction Costs Resulting From Rule Changes Furthermore The Models Must Be Updated With Any Production Requirements Such As Working Environment Bim Models Will Not Be Developed In This Project But The Models That Are Developed Must Be In Ifc4 Format So That They Can Be Transferred To Bim For Any Later Development Of The Model The Models For Building Costs Are A First Step To Assessing The Total Effects Of Rules Connected To A Buildings Lifecycle For Example Energy Use In The Buildings Lifetime In Addition To Developing Building Models The Tenderer Must Ensure That There Is Sufficient Data That Can Be Used As Input Values In The Calculations Tenders Must Include An Account Of How Tenderers Will Obtain Such Data Dibk Has Established A Reference Group For The Project With Representatives From Relevant Actors In The Trade Tenderers Are Asked To Give An Account Of How They Would Make Use Of The Above Mentioned Reference Group It Is A Prerequisite In The Eus Building Energy Directive Directive 2010 31 Eu Article 5 That A Cost Optimum Level Is Calculated For Energy Savings In Buildings In Accordance With Regulation 244 2012 And Accompanying Guidelines Tenderers Are Requested To Assess Whether This Regulation Or Parts Of It Are Relevant For The Development Of The Building Models In This Project The Development Of The Model Must Be Completed By 1 3 2020 Meetings Will Be Arranged Between The Tenderer And The Contracting Authority As Needed During The Development Of The Model The Model That Is Developed Must Be Documented In A Report That Is To Be Made Available For The Contracting Authority Periodic Calculations And Maintenance Of The Model Calculations Of The Cost Effects Of Rule Changes By Using The Developed Model Are To Be Made Ad Hoc Based On The Contracting Authoritys Needs There Can Be A Need To Set Fixed Intervals For The Calculations If The Contracting Authority Finds It Appropriate A Cost Calculations Must Be Made In 2020 Based On A Selection Of Previous Rule Changes The Calculation Results Must Be Documented In Writing In Reports That Are Suitable For Publication To A Broad Target Group Of Interested Persons In The Bae Industry Authorities And Media In Addition The Basic Data For The Calculations Must Be Digitally Available For The Contracting Authority The Contracting Authority Will Continually Maintain The Model And Update The Necessary Data Basis For The Calculations Time Limit For Receipt Of Tenders Or Requests To Participate Date 06 09 2019 Local Time 12 00

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail