Request For Expressions Of Interest For Consulting Services Support For Grid Integrated Renewable Energy Generation

Tender Detail

20791710
KEEREP 2A2 2018
World Bank
Request For Expressions Of Interest For Consulting Services Support For Grid Integrated Renewable Energy Generation
ICB
Eastern Europe
28-06-2019

Work Detail

Request For Expressions Of Interest For Consulting Services Support For Grid Integrated Renewable Energy GenerationProject Energy Efficiency And Renewable Energy ProjectThe Following Tasks Are Expected To Be Carried Out Task 1 Least Cost Planning For Optimal Renewable Energy Mix First The Consultant Shall Review Existing Re Policies Action Plans Targets Feasibility Studies Weather And Hydrology Data That Are Necessary To Assess Technical And Economic Potential For Re In Kosovo Based This Initial Assessment The Consultant Shall Determine The Theoretical Technical And Realizable Potential Including The Associated Costs For New Re Generation In Kosovo Second The Consultant Is Expected To Produce A Supply Curve Assessment For Each Re Technology As Well As The Comprehensive Re Supply Curve Finally Using Power System Planning The Consultant Shall Determine The Most Optimal Renewable Energy Penetration For Kosovo S Power System Based On Relative Costs And Taking Into Account Demand Forecasts Renewable Targets And Other Conventional Generation In The System Task 2 Distribution Grid Integration Study For Incorporating Distributed Renewable Energy GenerationThis Task Requires The Consultant To Undertake A Detailed Analysis Of The Distribution Grid And Various Grid Connected Generation Capacity While Taking Account For Future Planned Distributed Generation Capacity Additions In Cooperation With Kosovo Electricity Distribution Company Keds And Ero The Consultant Should Evaluate The Potential Locations For Distributive Generation And Assess Grid Requirements For Their Integration In The Distribution Network The Study Should Include A Technical Assessment Showing The Distribution Grid Parameters I E Voltage Stability Grid Losses Reactive Energy Compensation Etc Before And After The Connection Of New Distributive Generation

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail