Contract Notice High Voltage CableDelivery Installation And Assembly Of A 110 Kv Cable Including Fittings In G ttingenDescription Delivery Installation And Assembly Of A 110 Kv Cable Including Fittings In G ttingen Scope Of Work Is The Construction Of A 110 Kv Cable On A Route Length Of 2 6 Km From Uw Grone To Uw Leinestrasse The 110 Kv Cable Is Fed Into An On Site Empty Pipe System Pe 100 Rc Pipe Sdr 17 D 160 X 9 5 Mm The Socket Holes Are Made According To The Contractors Instructions Expected Execution Period Start Of Cable Pull Of The First Construction Phase Approx August 2019 Commissioning Of The Cable By The End Of October 2019 At The Latest Features Overview Cable Delivery Of A Na2xs Fl 2Y Alternatively N2xs Fl 2Y For A Transmission Capacity Of At Least 120 Mva Incl Fittings Sleeves End Caps Etc Laying The 110 Kv Cable Installation Prepare For Commissioning Construction Of A Crossbonding System For Final Assembly The Contractor Has To Build The Entire Crossbonding System Incl The Final Assembly Tests Te Measurement Attenuated Ac Voltage Dac And Sheath Test Adaptation Of The Two Portals In The Substations Together With The Mounting Frame Enclosure Time Limit For Receipt Of Tenders Or Requests To Participate Date 18 02 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.