Tenders Are Invited For Emergency Rehabilitation For Mocuba Water Supply IntakeEmergency Resilient Recovery ProjectThe Administracao De Infra Estruturas De Agua E Saneamento Now Invites Sealed Bids From Eligible Bidders For The Existing Water Supply System In Mocuba Is Still Mostly Based In The Pre Independence Period Infrastructures In The Meanwhile Some Remodelling Works Have Been Undertaken More Specifically At The Water Treatment Plant Wtp Which Is Part Of The Citys Water Distribution Centre Two New Settling Tanks Were Built And A New Container Filtration System Was Installed As A Result Of The 2015 Floods Part Of The Existing Raw Water Transport Main At The Outlet Of The Intake Tower Was Destroyed Including The Access Bridge Therefore New Reparation Works Were Necessary The Renewal Of The First 25M Approx Of The Raw Water Transmission Main Was Done The Main Objectives Of The Emergency Works Phase I Are The Water Intake Rehabilitation And Water Supply Network Rehabilitation Leakage Reduction Interventions The Above Mentioned Daily Capacity Of The Existing Wtp Was Calculated Using Different Collected Information According To Collins Representatives The New Filtration Step Max Capacity Is 300M3 H According To Mcas Mocuba Water Supply And Treatment Works Emergency Upgrades From 28Th Of August 2012 The Wtp Was Designed For Q 240 M3 H
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.