GTR 120806155

Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works – Sv-Kwe-261117-006 - Tw - Hkw Nord Spartentrasse - Tragwerksplanung

ICB — International Competitive Bid Closes Dec 18, 2026 Western Europe
Tender Information
GTR Reference
120806155
Tendering Authority
Subscribe to view
Tender No
806027-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works – Sv-Kwe-261117-006 - Tw - Hkw Nord Spartentrasse - Tragwerksplanung
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
18-12-2026
Work Detail
Engineering Design Services For The Construction Of Civil Engineering Works – Sv-Kwe-261117-006 - Tw - Hkw Nord Spartentrasse - Tragwerksplanung. As Part Of The Energy Transition, Stadtwerke München (Swm) Is Planning New Systems At Its Largest Generation Site, The North Combined Heat And Power Plant (Hkw Nord). Before The New Facilities Can Be Constructed, The Construction Site Must Be Cleared. This Includes The Relocation Of Various Lines With Different Nominal Widths And Dimensions. For The Relocation Of The Underground Pipes And The Construction Of New Shafts And Other Underground Structures, The Structural Planning And The Planning Of The Necessary Excavation Pits Must Be Carried Out. The Following Pipes And Systems Must Be Relocated Or Rebuilt: - District Heating Pipes, - Drinking Water Pipes, - Cable Shafts And Empty Pipe Routes, - Drainage Systems (Rainwater Pipes, Pumping Stations, Trenches And Pressure Relief Shafts), - Gas Pipes, - Mixed Water Pipes The Provision Of Services Is Regulated According To Four Priorities: Priority 1 - Factory Road South Of The “Bmhw” Construction Site: Completion Of Planning Including Participation In The Award Of The Contract: May 31St 2027; Priority 2 - Drainage System Replacement: Completion Schedule: June 30, 2027; Priority 3 - Works Roads Next To The “Nathan” Construction Site: Completion Of Planning: July 31, 2027 Priority 4 - Expansion Of The Existing Cable Duct: Completion Of Planning Including Participation In Lv February 29, 2028. If The Contractor (Contractor) Fails To Comply With The Binding Interim Or Final Dates In Accordance With The Above-Mentioned Priorities, A Contractual Penalty Will Be Levied. This Amounts To 0.2% Of The Relevant Net Billing Amount Per Calendar Day In Which The Deadline Is Exceeded. For Interim Appointments, Only The Remuneration Share Of The Partial Services Due By Then Will Be Taken Into Account. The Contractual Penalty Is Limited To A Total Of 5% Of The Net Billing Amount.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e5a3b74b-21d4-4419-80c2-5200cbd0f14b.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you