GTR 120702732

Tenders Are Invited For Wastewater Treatment Plant Construction Work – Task 1 - Wastewater Treatment Plants, Part 1 - Extension Of The Sewage Treatment Plant In Niepołomice Ul. Mariana Lutosławskiego 4 Carried Out As Part Of The Project Entitled Expansion Of Water And Sewage Management In The Niepołomice Commune - Stage Ii

ICB — International Competitive Bid Closes Jan 08, 2027 central europe
Tender Information
GTR Reference
120702732
Tendering Authority
Subscribe to view
Tender No
798891-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Wastewater Treatment Plant Construction Work – Task 1 - Wastewater Treatment Plants, Part 1 - Extension Of The Sewage Treatment Plant In Niepołomice Ul. Mariana Lutosławskiego 4 Carried Out As Part Of The Project Entitled Expansion Of Water And Sewage Management In The Niepołomice Commune - Stage Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
08-01-2027
Work Detail
Wastewater Treatment Plant Construction Work – Task 1 - Wastewater Treatment Plants, Part 1 - Extension Of The Sewage Treatment Plant In Niepołomice Ul. Mariana Lutosławskiego 4 Carried Out As Part Of The Project Entitled Expansion Of Water And Sewage Management In The Niepołomice Commune - Stage Ii. 1. Description Of The Subject Of The Order: The Subject Of The Order Is The Design And Execution Of Construction Works For Task 1 - Sewage Treatment Plants, Part 1 - Extension Of The Sewage Treatment Plant In Niepołomice Ul. Mariana Lutosławskiego 4 On Plots No. 1515 And 1516/2 In Niepołomice Along With The Construction Of A Pipeline Discharging Treated Sewage Into The Vistula On Plots No. 998, 966/5, 1516/2, 1515, 1506, 997/11, 997/10, 997/13, 266/7, 997/9, 1508/1, 1523/2, 289/2, 989/1, 997/7, 997/12, 965/7, 1520/2 In Niepołomice And Renovation/Renovation Of The Existing Section Of The Pipeline Discharging Treated Sewage On Plot No. 255/14, 266/11, 1, 265 In Niepołomice. As Part Of The Order, The Investor Plans To Expand The Sewage Treatment Plant In Niepołomice With The Following Parameters: Parameters Existing Before The Expansion (According To The Design Documentation): 1. Average Daily Amount Of Sewage Qdśr = 4500 M3/D 2. Maximum Daily Amount Of Sewage Qdmax = 5850 M3/D 3. Average Hourly Amount Of Sewage Qhśr = 187.5 M3/D 4. Maximum Hourly Amount Amount Of Sewage Qhmax = 450 M3/D 5. Bod5 Load In Raw Sewage = 2308.5 Kg/D 6. Pe = 38,475 Parameters Of The Treatment Plant After Expansion: 1. Average Daily Amount Of Sewage Qdśr = 5566 M3/D 2. Maximum Daily Amount Of Sewage Qdmax = 7792 M3/D 3. Average Hourly Amount Of Sewage Qhśr = 232 M3/D 4. Maximum Hourly Amount Of Sewage Qhmax = 500 M3/D 5. Bod5 Load In Raw Sewage = 3879 Kg/D Pe = 64634 Length Of The Pipeline Discharging Treated Sewage, With A Diameter Of Min. Dn500: 1.50 Km Length Of The Pipeline/Open Channel Discharging Treated Sewage Planned For Renovation/Renovation: 400M A Detailed Description Of The Subject Of The Order And The Requirements Regarding As-Built Documentation As Well As Implementation Are Included In The Functional And Utility Program, Swz, Contract Template And Material And Financial Schedule, Which Is An Integral Part Of The Contract. 2. On-Site Visit, The Ordering Party In Accordance With Section 134. 2 Point 9 Of The Public Procurement Law Requires The Bidder To Carry Out A Mandatory On-Site Inspection Of The Sewage Treatment Plant In Niepołomice And The Planned Construction Of The Pressure Pipeline And Its Repair/Renovation. The Site Visit Will Cover The Area Where Construction Works Will Be Carried Out. The Ordering Party Will Enable An On-Site Inspection After Prior Arrangement Of A Date. If You Wish To Undergo A Visit, Please Report It By Phone: 888 040 290 Or By E-Mail: [email protected]. After Receiving The Application, The Ordering Party Will Set A Deadline For The Application No Later Than 7 Business Days From The Date Of Reporting The Willingness To Undergo An On-Site Inspection. 3. Planting Trees And Nesting Boxes The Task Should Involve Planting Trees And Shrubs That Do Not Result From Administrative Decisions. 4. Additional Information: 1) The Treatment Plant Will Not Be Decommissioned For The Duration Of The Expansion, The Contractor Will Carry Out Work On An Operating Facility, Therefore The Work Schedule Should Be Planned In Such A Way That It Does Not Interfere With The Operation Of The Treatment Plant And Does Not Affect The Parameters Of The Treated Sewage. 2) In The Vicinity Of Plot 1516/2 In N
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f013ab6b-5fd8-4089-929b-35c067085fc7.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you