GTR 120661588

Tenders Are Invited For Ventilation Installation Work – New Building As An Extension Of The Lambertischule: Ventilation Systems

ICB — International Competitive Bid Closes Dec 16, 2026 Western Europe
Tender Information
GTR Reference
120661588
Tendering Authority
Subscribe to view
Tender No
793032-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Ventilation Installation Work – New Building As An Extension Of The Lambertischule: Ventilation Systems
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
16-12-2026
Work Detail
Ventilation Installation Work – New Building As An Extension Of The Lambertischule: Ventilation Systems. Ventilation The Ventilation Of The New Building Is Carried Out Via Two Central Ventilation Devices That Are Installed On The Roof Of The Building. The Air Is Distributed Via Vertical Installation Shafts And Roof Ducts To The Respective Areas Of Use. The Ventilation System In The Serving Kitchen Is Routed Via A Separate Ventilation Shaft To Ensure Economical And Space-Saving Pipe Routing Within The Building. The Kitchen Exhaust Air Ducts Are Designed As Grease-Tight Ducts In Accordance With The Requirements For Greasy Exhaust Air. The Fire Protection Separation Of The Individual Fire Compartments Is Carried Out By Installing Suitable Fire Dampers. The Kitchen Is Supplied With Fresh Air Via Displacement Air Outlets, While The Exhaust Air Is Collected Via Kitchen Hoods. The Ventilation System For The Classrooms, The Cafeteria And The Associated Adjoining Rooms Is Accessed Via A Separate Installation Shaft. The Air Is Distributed Within The Building Via A Duct Network, Which Is Mainly Installed Above The Suspended Ceilings Or As A Visible Installation. Constant Volume Flow Controllers (Kvr) Are Used In The Classrooms To Regulate And Ensure The Required Air Volumes. Due To The Fluctuating Number Of People, Variable Volume Flow Controllers (Vvr) Are Only Used In The Cafeteria Area To Enable Needs-Based Operation. The Fire Protection Requirements Are Met By Arranging Suitable Fire Dampers In The Required Separating Components. In The Sanitary Rooms, Air Is Distributed Primarily Via Disc Valves. In The Classrooms And The Cafeteria, The Air Volumes Are Introduced And Removed Via Ventilation Grilles In Round, Square Or Rectangular Duct Cross-Sections. In The Area Of ​​The Educational Center, Linear Slot Diffusers Are Used To Ensure Even And Draft-Free Air Distribution While At The Same Time Meeting High Architectural Requirements. Insulation On The Roof With Mineral Wool And Seawater-Resistant Aluminum Sheet Metal Jacket. The Total Construction Period For This Construction Project Is Planned To Extend From March 2027 To The End Of 2027, Plus Renovation Work On The Existing Building In Early/Mid-2027.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e8e1a93c-626d-4b05-9fa5-6be280467ec5.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you