GTR 120626293
Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.481 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width Of 0.5 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Must Be Filled With Red Gravel 0.15 M Thick - The Second Foundation Must Be Paved With 0.15 M Thick Concrete Paving - Concrete Can Be Mixed With Concrete Or Concrete Must Be Tied To A Width Of 0.0 Meters And The Correct Placement Of The Height Of 0.075 Meters - 20 Meters Of Joint Work To Use A 14 Mm Cane Bar. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.4 M Apart - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Horizontal And Longitudinal Steel Ropes - Recipients Must Be Covered With Concrete With Sackcloth Or Filter Cloth And Watered For At Least 7 To 10 Days After Removing The Molded Board - Build A 1-Mete
ICB — International Competitive Bid
Closes Nov 27, 2026
South-Eastern Asia
Tender Information
GTR Reference
120626293
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.481 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width Of 0.5 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Must Be Filled With Red Gravel 0.15 M Thick - The Second Foundation Must Be Paved With 0.15 M Thick Concrete Paving - Concrete Can Be Mixed With Concrete Or Concrete Must Be Tied To A Width Of 0.0 Meters And The Correct Placement Of The Height Of 0.075 Meters - 20 Meters Of Joint Work To Use A 14 Mm Cane Bar. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.4 M Apart - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Horizontal And Longitudinal Steel Ropes - Recipients Must Be Covered With Concrete With Sackcloth Or Filter Cloth And Watered For At Least 7 To 10 Days After Removing The Molded Board - Build A 1-Mete
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
South-Eastern Asia
Political Region
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
Last Date of Bid Submission
27-11-2026
Work Detail
Construction of 1 reinforced concrete road, 0.481 km long, 5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil, shoulder width of 0.5 m, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation must be filled with red gravel 0.15 m thick - The second foundation must be paved with 0.15 m thick concrete paving - Concrete can be mixed with concrete or concrete Must be tied to a width of 0.0 meters and the correct placement of the height of 0.075 meters - 20 meters of joint work to use a 14 mm cane bar. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.4 m apart - Do not push the cart or drive a roller coaster or concrete mixer truck over the horizontal and longitudinal steel ropes - Recipients must be covered with concrete with sackcloth or filter cloth and watered for at least 7 to 10 days after removing the molded board - Build a 1-meter-long ditch across the road.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
23c1fde5-4a18-45ae-806b-a6287f85247f.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.