GTR 120448537

Tenders Are Invited For Preparation Of Design Documentation For The Expansion Of Ul. Bitwy Białostockej In Białystok, Service Road Along Ul. Gen. Wł. Andersa (Ul. 1Kdd) And The Road To The Incineration Plant (Ul. 4Kd-L, Ul. 2Kd-L).

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
120448537
Tendering Authority
Subscribe to view
Tender No
ZDM-XII.271.55.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Preparation Of Design Documentation For The Expansion Of Ul. Bitwy Białostockej In Białystok, Service Road Along Ul. Gen. Wł. Andersa (Ul. 1Kdd) And The Road To The Incineration Plant (Ul. 4Kd-L, Ul. 2Kd-L).
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
19-11-2026 Closed
Work Detail
1. The Subject Of The Order Is The Development Of Design Documentation For The Expansion Of Ul. Bitwy Białostockej In Białystok, Service Road Along Ul. Gen. Wł. Andersa (Ul. 1Kdd) And The Road To The Incineration Plant (Ul. 4Kd-L, Ul. 2Kd-L).2. The Scope Of The Order (Initial Assumptions) Is Presented In The Graphic Attachment Constituting Annex No. 7 To The Swz. 3. The Title Of The Construction Project Should Be Agreed With The Department Of Architecture Of The Białystok City Hall In Consultation With The Ordering Party.4. As Part Of The Task, Comprehensive Design Documentation Should Be Developed For: 1) Expansion Of Ul. Bitwy Białostockej In Białystok On The Section From Ul. Gen. Wł. Andersa To Ul. Veterans Along With The Reconstruction Of The Intersection With Ul. Veterans, In The Scope Of Reconstruction: Road, Exits, Pedestrian Path, Bicycle Path, Construction Of A Street Lighting Network, Technological Channel And Construction/Reconstruction Of Conflicting Technical Infrastructure. The Concept Of Rebuilding The Intersection With Ul. Combatants Should Be Executed In Two Variants: With Circular Motion And With Traffic Lights. Reconstruction Variants Should Be Supported By Traffic Intensity Studies. The Scope Of The Order Also Includes The Correction Of The Roundabout Located Along Ul. Gen. W. Andersa (Without Interfering With The Existing Road Structure), In Order To Improve Traffic Flow After The Expansion Of The Streets Constituting The Subject Of The Order.2) Expansion Of The Service Road Along Ul. Gen. Wł. Andersa (Ul. 1Kdd - In Accordance With The Local Development Plan) In Białystok, In The Scope Of Expansion Of: Road, Pedestrian Road, Construction Of A Service Channel, Street Lighting, Reconstruction Of Conflicting Technical Infrastructure; 3) Extension Of The Road To The Incineration Plant (Ul. 4Kd-L, Ul. 2Kd-L - In Accordance With The Local Spatial Development Plan) In Białystok, In The Scope Of Construction/Reconstruction Of: Road, Exits, Pedestrian Road, Bicycle Path, Service Channel, Street Lighting And Construction/Reconstruction Of Conflicting Technical Infrastructure. Preparation Of The Concept Of The Road System In Question (Service Road Along Ul. Gen. Wł. Andersa (Ul. 1Kdd), Road To The Incineration Plant (Ul. 4Kd-L, Ul. 2Kd-L), Ul. Bitwy Białostockej) Should Be Preceded By Measuring Traffic Intensity In Accordance With The Guidelines Of Wr-D-13 (Guidelines For Performing Road Traffic Analyzes And Forecasts).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a0a3a6d6-7397-4571-8f6a-c5e667a3b714.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you