GTR 120433819

Tenders Are Invited For Electrical Installation Work – Pwa-T3, T5, T6 (Selective) Electrical Tender, Bkp 232 Low-Voltage Installations

ICB — International Competitive Bid Closes Dec 04, 2026 Western Europe
Tender Information
GTR Reference
120433819
Tendering Authority
Subscribe to view
Tender No
780072-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Electrical Installation Work – Pwa-T3, T5, T6 (Selective) Electrical Tender, Bkp 232 Low-Voltage Installations
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Last Date of Bid Submission
04-12-2026
Work Detail
Electrical Installation Work – Pwa-T3, T5, T6 (Selective) Electrical Tender, Bkp 232 Low-Voltage Installations. Zurich Airports Infrastructure Is Undergoing A Gradual Renewal Process. In The Last 15 Years, Various Parts Of The Central Airport Infrastructure Have Been Extensively Renovated And Expanded: Dock B Was Completely Rebuilt, Terminal 2 Was Completely Renovated And Expanded, And The New Security Control Building With Centralized Access To The Airside Center Was Built Between Terminals 1 And 2. The Central Baggage Sorting System North Of Terminal 1 Is Currently Being Expanded And The Airport-Wide Baggage Sorting System Is Being Replaced And Renewed. In The Next Step, The Aging Parts Of The Central Airport Infrastructure Must Be Replaced: Dock A, Together With The Tower, Was Put Into Operation In 1985 And Its Structure Has Remained Largely Unchanged To This Day. In Terms Of Functionality, Sustainability And Quality, Dock A Can No Longer Meet Todays Requirements. Based On A Comprehensive Analysis, It Was Decided To Replace The Existing Dock A With A New Building North Of The Current Building. The Replacement Building For Dock A, The New Tower And The Extensively Renovated Apron To Dock A With All Further Adjustments, Expansions And Conversions Of The Central Airport Infrastructure Are The Most Important Structural Measures Of The Next 15 To 20 Years. During Phased Implementation, It Must Be Ensured That Operations Can Continue As Normal And That Future Functional Requirements Can Be Met With The Newly Constructed Buildings. The Pwa.T “Perimeter Exposure Root A” Project Is Divided Into Three Sub-Projects (T3, T5 And T6) And Includes The Implementation Of Adjustments To Existing Media And Systems. These Are Located In And Outside The Demolition Perimeter Of Wurzel Dock A. The Work Is To Be Carried Out For The Dismantling Stage And For The Further Phases Of The Main Airside Project. The Implementation Of The Present Services Will Begin In 2027 And Will Take Place In Stages; According To The Indicative Project Dates (Chapter Iv, Section 1.1), The Focus Is On The Years 2027 To 2029. Subsequent Stages In Connection With The Main Airside Project Can Follow Until Around 2033 After A Longer Interruption. These Late Dates Are For Guidance Only; They Correspond To The Current Planning Status And Can Change As The Project Progresses. Essential Parts Of The Building Technology For Supplying The Control Tower, Dock Root A, Dock A, Airside Center And The Passport Control Hall Are Located In The Demolition Perimeter Of Dock Root A.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5e179f9d-f903-4eb1-98e2-4a2e43ac917f.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you