GTR 120416760
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Design Team Redevelopment Of Mfa Milheeze
ICB — International Competitive Bid
Closes Dec 10, 2026
Western Europe
Tender Information
GTR Reference
120416760
Tendering Authority
Subscribe to view
Tender No
775577-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Design Team Redevelopment Of Mfa Milheeze
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
10-12-2026
Work Detail
Architectural, Construction, Engineering And Inspection Services – Design Team Redevelopment Of Mfa Milheeze. The Agreement Consists Of Drawing Up An Integrated Design For The New Construction Of The Mfa In Milheeze At The Current Location. The Existing Building Will Be Demolished To Make The New Construction Possible. For The Benefit Of This New Building, The Municipality Wants To Select A Design Team As A First Step That Is Responsible For Developing The Design Up To And Including The Technical Design Phase (To). It Has Not Yet Been Definitively Determined Whether The Design Will Be Submitted To The Municipal Council For Interim Decision-Making. If This Is The Case, This Decision-Making Will Take Place After Completion Of The Final Design Phase (Do) And Will Include, Among Other Things, The Release Of The Required Credit. After Any Positive Decision-Making By The Municipal Council, The Design Will Be Further Developed By The Design Team Up To And Including The To Phase, So That The Design Can Serve As A Basis For The Tender And Final Realization Of The Building. The Contracting Authority Deliberately Combined The Contract. The Design Team Will Create An Integral Design In Phases And Further Develop It Into An Integral Specification. This Means That The Architect Not Only Designs Architecturally, But Is Also Responsible For The Installation Concept, Building Physics, Acoustics, Etc. In Addition, The Architect Is Responsible For All Other Matters That Need To Be Arranged To Make Construction Possible. This Includes Carrying Out Investigations, Applying For An Environmental Permit, Etc. The Assignment Has Therefore Been Combined In Terms Of Disciplines And Activities. Because The Client Consciously Wants To Make One Point Of Contact Responsible For The Entire Integrated Design, Dividing The Assignment Into Lots Is Not An Obvious Choice. This Would Create Undesirable Transfer Moments For The Client And Make It More Difficult To Arrive At A Coherent Integral Design. In Addition, The Responsibility For A Correct Transfer Also Lies With The Client, Even Though It Does Not Have The Necessary Knowledge And Experience In-House. In The Eyes Of The Client, The Intended Form Of Collaboration Is A Common Construction For Design Assignments And The Size Of The Assignment Makes It Ideally Suited For Small And Medium-Sized Companies. That Is Why, In Her View, A Division Into Plots Is Not Necessary And She Does Not Opt For This. The Agreement Is Entered Into For The Duration Of The Design Process, Including Tendering And Final Realization.
Key Value
Tender Value
350,000 - EUR
Tender Documents
Global Tender Document
e1fdc2cf-e435-4c2a-8989-f90d2f49f242.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.