GTR 120292515
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work - Implementation Of Design, Construction And Performance Of Author Supervision For The Facility Construction Of A New Strumyani Border Checkpoint Between Bulgaria And The Republic Of North Macedonia
ICB — International Competitive Bid
Closes Dec 07, 2026
Eastern Europe
Tender Information
GTR Reference
120292515
Tendering Authority
Subscribe to view
Tender No
769889-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work - Implementation Of Design, Construction And Performance Of Author Supervision For The Facility Construction Of A New Strumyani Border Checkpoint Between Bulgaria And The Republic Of North Macedonia
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
07-12-2026
Work Detail
Works For Complete Or Part Construction And Civil Engineering Work - Implementation Of Design, Construction And Performance Of Author Supervision For The Facility Construction Of A New Strumyani Border Checkpoint Between Bulgaria And The Republic Of North Macedonia. The Main Goal Of The Project Is To Improve Connectivity In The Region And Stimulate Economic Growth By Facilitating The Traffic Of People And Goods, Strengthening Communication Links And Facilitating Access To The Main Ten-T Network, Including The Connection With Transport Corridors Iv And Viii. Borehole Construction, Incl.: A. Construction Of Application And All Necessary Documents. For The Notification/Permit Construction Procedure Of Study. Drilling, Operating Drilling, Issuance Of A Permit For Water Abstraction From Underground Water Through The Construction Of A New Water Supply. Facility And Providing Full Assistance To The Contractor In The Process Of Carrying Out Procedure B. Construction Of A Tube Well (Borehole) To Ensure The Needs Of Consumers. Of Water During Operation Of The Strumani Border Crossing. Initial Depth Of The Future Subsea Facility – 80M. Produced Of A Draft Document. For The Establishment Of A Sanitary-Security Zone (Sz) Acc. Name No. 3 Of 16.10.2000 For Condition. And The Order For Research, Design, Approval And Operation Of Sanitary Protection Zones Around Water Sources And Facilities For Drinking And Domestic Water Supply And Around Water Sources Of Mineral Waters Used For Medicinal, Prophylactic, Drinking And Hygienic Needs. D. Full Cooperation Of The Node In The Process. Under Items A And B Until The End Of The Construction Procedure. And Acceptance Of A Water Supply Facility And The Establishment Of A Pop, Including Preparation Of Additional Information And Documents Required By The Competent Bodies Until The Final Administrative Acts Are Issued. Dane. No. 2: Preparation Of An Investment Project: A. Preparation Of An Investment Project In The Technical Project Phase, According To Technical Specification, Requirement For The Development Of An Investment Project, As Well As Actual, Representing A Condition, Consequence Or Supplement To It, Considering The Regulations. 21.05.2001 On The Scope And Content Of Investment Projects, Other Applicable Legislation, As Well As Laid Down In The Technical Specification Requirements For The Development Of An Investment Project, As Well As Actual, Representative Condition, Consequence Or Addition To It, In Accordance With The Regulations, Including Operating Companies And Other Bodies And Approved According To The Procedure Of The Zut. C. Fulfillment Of His Duties As A Designer, During Construction And Commissioning Of The Construction, In Accordance With With Current Bulgarian Legislation (Ordinance No. 3 Of 31.07.2003 On Drawing Up Acts And Protocols During Construction And Ordinance No. 2 Of 31.07.2003 On The Commissioning Of Construction Sites In Bulgaria And Minimum Warranty Periods For Completed Construction And Assembly Works, Facilities And Construction Sites). Eliminate, At His Own Expense, Deficiencies In The Project Established During The Execution Of Inspections By The Assignee And/Or The Consultant, Evaluating The Compliance Of The Project With Essential Requirements For Construction And Technical Control Under The Construction Part According To The Zut, Including During The Execution Of The Construction.D. Taking Responsibility For The Quality Of The Project During Execution. Of Construction. Important: The Executor Is Obliged To Agree The Investment Project Drawn Up By Him With All The Necessary State And Municipal Authorities In Accordance With The Legi
Key Value
Tender Value
5,482,449 - BGN
Tender Documents
Global Tender Document
407ebfb0-ddf0-4568-87fe-585dbcc2a718.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.