GTR 120238614
Tenders Are Invited For Multi-Dwelling Buildings Construction Work - Construction Of Two Multi-Family Residential Buildings (No. 2A And 2B) Tbs In Jelenia Góra In A Closed Shell State Along With The Necessary Accompanying Infrastructure - Stage Ii And Execution Of Networks And External Installations And Land Development
ICB — International Competitive Bid
Closes Dec 10, 2026
central europe
Tender Information
GTR Reference
120238614
Tendering Authority
Subscribe to view
Tender No
765804-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Multi-Dwelling Buildings Construction Work - Construction Of Two Multi-Family Residential Buildings (No. 2A And 2B) Tbs In Jelenia Góra In A Closed Shell State Along With The Necessary Accompanying Infrastructure - Stage Ii And Execution Of Networks And External Installations And Land Development
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
10-12-2026
Work Detail
Multi-Dwelling Buildings Construction Work - Construction Of Two Multi-Family Residential Buildings (No. 2A And 2B) Tbs In Jelenia Góra In A Closed Shell State Along With The Necessary Accompanying Infrastructure - Stage Ii And Execution Of Networks And External Installations And Land Development. 1. The Scope Of The Investment Includes Partial Implementation Of Stage Ii Within The Financial Resources Available To The Ordering Party And Includes In Particular The Following Elements: 1) Preparation Of Detailed Designs Separately For The Facilities And Separately For The Entire External Technical Infrastructure Within The Scope Covered By The Subject Of The Order. 2) Construction Of Two Multi-Family Residential Buildings In A Closed Shell State, Which Means Complete Construction Of Foundations And Foundation Walls, Including Insulation, Load-Bearing And Partition Walls, Ceilings, Roof Trusses, Complete Roofing With Flashings And Drainage Systems, Massive Ceilings, Staircases, External Window And Door Joinery. The Implementation Technology Must Ensure Protection Of The Facility Against The Harmful Effects Of Weather Conditions For No Less Than 12 Months. 3) Execution Of External Sanitary Installations And Networks As Well As External Electrical And Telecommunications Installations To The Extent Necessary For The Target Operation Of The Facilities. A Detailed Description With Exclusions Can Be Found In Point 5 4) Development Of The Area, Including The Construction Of A Foundation For The Final Surface Made Of Concrete Cubes In The Area Related To The Operation Of Both Facilities, Including Access From A Public Road. The Development Of The Area Excludes: Construction Of A Public Exit, Fire Tank And Its Infrastructure, Construction Of The Final Surface, Sidewalks, Curbs As Well As Parking Spaces, Construction Of Small Architectural Elements, Construction Of A Playground. 5) Construction Of Underground Technical Infrastructure Includes The Following Elements And Exclusions: A) Reconstruction Of A Rain Collector On A Public Road Is Not The Subject Of The Order, B) Construction Of A Water Supply Network And Connections To The Extent Necessary For The Target Operation Of The Two Facilities, C) Construction Of A Sanitary Sewage System And Connections To The Extent Necessary For The Target Operation Of The Facilities Specified In Point 2, D) Construction Of An External Rainwater Sewage System With Connections To The Extent Necessary For The Target Operation Of The Facilities. Due To The Separation Of The Reconstruction Of The Rain Collector Along A Public Road, Roof Drainage Should Not Be Combined With The Storm Sewage System At This Stage. E) The Construction Of A Hydrant System Together With The Construction Of A Fire Pumping Station And A Fire Tank For External Fire Extinguishing Is Not The Subject Of The Order. F) Construction Of External Electrical Installations Supplying Both Buildings. G) Construction Of Telecommunications Ducts Leading To Both Buildings. H) Reconstruction Of The Lower Heat Source Installation And Its Connection To The Two Multi-Family Residential Buildings Planned For Construction. 6) The Ordering Party Allows For Changes In Technology After Obtaining The Written Consent Of The Ordering Party. The Technology Adopted By The Contractor Must Meet The Parameters And Criteria Adopted In The Design Documentation As Well As Fully Comply With The Adopted Standards
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c4f23736-3bad-475e-97d3-61474f14d649.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.