GTR 120152829
Tenders Are Invited For Construction Work – Construction Of Two Multi-Family Residential Buildings With Infrastructure In Zabrze At Ul. Modrzewiowa (Plot No. 3936/65)
ICB — International Competitive Bid
Closes Dec 04, 2026
central europe
Tender Information
GTR Reference
120152829
Tendering Authority
Subscribe to view
Tender No
757075-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – Construction Of Two Multi-Family Residential Buildings With Infrastructure In Zabrze At Ul. Modrzewiowa (Plot No. 3936/65)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
04-12-2026
Work Detail
Construction Work – Construction Of Two Multi-Family Residential Buildings With Infrastructure In Zabrze At Ul. Modrzewiowa (Plot No. 3936/65). 1. The Public Procurement Procedure Is Conducted In The Form Of An Open Tender, Pursuant To Art. 132 Of The Act Of 11 September 2019 - Public Procurement Law (Journal Of Laws Of 2022, Item 1710) [Hereinafter Also Referred To As Pzp]. 2. The Ordering Party Does Not Provide For An Electronic Auction. 3. The Ordering Party Does Not Plan To Submit An Offer In The Form Of Electronic Catalogues. 4. The Ordering Party Does Not Conduct Any Proceedings To Conclude A Framework Agreement. 5. The Ordering Party Does Not Reserve The Right To Apply For The Contract Only By The Contractors Referred To In Art. 94 Pzp. 6. The Ordering Party Does Not Allow The Submission Of Partial Offers: 1) The Offer Must Cover The Entire Order; 2) A Partial Offer Will Constitute An Offer With Content Inconsistent With The Terms Of The Order And Will Be Rejected, In Accordance With Art. 226 Section 1 Point 5 Of The Act; 3) Reasons For Not Dividing The Contract Into Lots: Directive 2014/24/Eu, In Recital 78, Indicates That, In Order To Increase Competition, Contracting Authorities Should Be Particularly Encouraged To Divide Large Contracts Into Lots. The Order Was Not Divided Into Parts For The Following Reasons: A) The Subject Of The Order Is The Performance Of Functionally Related Works - Construction Of Buildings With Infrastructure. Separating Work Would Pose A Risk Of Organizational Problems That Could Not Be Eliminated, Related To Responsibility For Individual Elements Of Work Performed By Different Contractors. B) In The Case Of This Type Of Work (Simultaneous Performance Of Work Within Buildings From Different Industries), It Is Not Possible To Clearly Define The Rules Of Responsibility For One Construction Site (It Would Be Handed Over To Many Contractors In Parallel). It Is Also Not Possible To Separate The Responsibilities Of Multiple Construction Managers. C) Economic Considerations. Splitting The Order Would Result In The Multiplication Of Certain Groups Of Costs To The Offer Price (Indirect Costs, Insurance Costs, Etc.). D) In The Case Of This Type Of Work Performed By Different Contractors, It Would Not Be Possible To Clearly Define The Principles Of Third-Party Liability Insurance (E.G. If Many Contractors Performed The Works Simultaneously, It Would Be Difficult To Determine The Entity Responsible For The Damage Covered By The Third-Party Liability Insurance Policy). E) In The Case Of This Type Of Work Performed By Different Contractors, A Delay By One Of The Contractors Would Negatively Affect The Timely Completion Of Other Elements Of The Investment - Dependent On The Timely Performance Of The Work By Another Contractor. F) In Each Partial Offer, The Contractor Would Have To Assume A Separate Valuation For The Use And Delivery Of The Same Type Of Equipment To The Construction Site, In A Situation Where, When Submitting One Offer, These Costs Would Be Included Once. G) Each Of The Contractors Would Include Separate Costs Of Third Party Liability Insurance In The Price, Which Would Increase The Level Of The Ordering Partys Expenses, H) Increasing The Delivery Volume Is Generally Related To Reducing The Cost Of This Delivery. If Divided Into Parts, The Cost Of Delivery Would Increase, Among Others: Materials Necessary For Implementation
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
cb265865-b447-48f3-ac30-f2d510b91aab.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.