GTR 120118462
Tenders Are Invited For Track Construction Works – V256 Renewal Of Switches 807/808 And Kr. 804: Track And Civil Engineering Services
ICB — International Competitive Bid
Closes Dec 02, 2026
Western Europe
Tender Information
GTR Reference
120118462
Tendering Authority
Subscribe to view
Tender No
760151-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Track Construction Works – V256 Renewal Of Switches 807/808 And Kr. 804: Track And Civil Engineering Services
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
02-12-2026
Work Detail
Track Construction Works – V256 Renewal Of Switches 807/808 And Kr. 804: Track And Civil Engineering Services. The Intended Construction Project V256 Includes The Renewal Of The Structures W807, W808 And Kr804 And 25 M Of Track Out Of Town Between The Ludwigshafen Hauptbahnhof And Mayor-Kutterer-Straße Stops. The Structures Are Located Underground (Tunnels), Access/Service Must Only Take Place Via The Mayor-Kutterer-Straße Stop Area. The Ludwigshafen Hauptbahnhof Light Rail Stop Will Continue To Be Used For Passenger Changes. As Part Of The Construction Project, The Existing Superstructure Of The Construction Rail Profile S41 On Wooden Sleepers From 2002 In The Ballast Track Will Be Completely Dismantled Up To Approx. 25 Cm Below The Existing Sleepers. The New Structure Will Once Again Be An Open Gravel Track (49E1) With Concrete Sleepers And The Renovation Will Take Place In The Old Location. The Overall Construction Measure Essentially Includes: - Dismantling The Existing Track Structures W807, W808 And Kr 804 (Rail Profile S41) And Sleepers. - Unloading Of Track Materials - Renewal Of The Track (Vignol Rail In The Open Ballast Track) On Prestressed Concrete Sleepers Including Railway Ballast - Removal And Reinstallation Of The Existing Track (49E1) - Replacement Of Concrete Sleepers In The Area Of The Restored Track - Tamping And Straightening Work - Traffic Safety Measure For The Entire Construction Project - Protective Measures For Track Construction Work In The Tunnel The Production And Delivery Of The Track Materials Is Not Part Of This Tender. The Materials Are Provided By Ag.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e822f1fe-f580-48d0-86b0-4bdfa68a05e0.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.