GTR 120061239

Corrigendum - Quotation Are Invited For Drain Line Replacement Works M Station Block 10, 20 & 30 M Station

ICB — International Competitive Bid Closes Nov 03, 2026 — 1 days left Asia
Tender Information
GTR Reference
120061239
Tendering Authority
Subscribe to view
Tender No
2332602671
Financer Name
Self-Funded
Work Title
Corrigendum - Quotation Are Invited For Drain Line Replacement Works M Station Block 10, 20 & 30 M Station
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
03-11-2026 1 days left
Work Detail
Quotation Are Invited For Drain Line Replacement Works M Station Block 10, 20 & 30 M Station Jabel Ali. Scope Of Workjob Description: Drain Line Replacement Works M Station Block 10, 20 &301.0 Generalthe Scope Includes Replacement Of Th E Existing Drain Lines In Block 10,20 And 30 Units, Including Cutting, Fit-Up, Welding, Inspection, Andreinstatement. The Contractor Shall Arrange Minimum Four Mobilizations,As Required, To Complete The Full Scope Of Work. All Requiredmobilizations Shall Be Consid Ered Within The Contractor#S Quoted Scopeand Price.2.0 Pre-Bid Site Inspection:The Interested Bidders Shall Visit The Site Prior To Submission Of Thebid. Submission Of The Bid Shall Be Deemed To Have Considered All Siteconditions, Access Limitations, Work Complexi Ties, And Other Relevantfactors Observed During The Site Visit.Site Visits Can Be Arranged During Normal Working Hours From 07:30 Am To03:30 Pm (Monday To Thursday) Upon Prior Coordination With Dewa.The Contractor Shall Make Themselves Fully Familiar With The Work Scope,Plant Access Requirements, Facilities, Obstructions, Safetyrequirements, And Working Conditions Prior To Submission Of The Bi D. Noadditional Claim For Extra Cost Or Extension Of Time Will Be Entertainedafter Award Of The Contract.3.0 Technical Requirements: ##The Bidder Shall Maintain Applicable Wps, Pqr, And Wqt Records Forall Welding Activities Under The Scope Of Work.##The Contractor Ensures That All Wps/Pqr And Welder Qualifications(Wqt/Wpq) Are Valid And Comply With Asme Section Ix, Asme B31.1 Powerpiping, Appli Cable Dewa Standards/Specifications, And Other Relevantinternational Codes And Standards.##Qualification Of Bidder: The Bidder Shall Have Proven Experience Forsimilar Jobs In Power Plant And Evidence Shall Be Submitted To Dewa Asrequired4.0 Scope Of Work:##Site Su Rvey And Measurement Of Existing Drain Lines.##Verification Of Drain Line Routing And Dimensions.##Identification And Marking Of Lin E Replacement Locations.##Arrangement Of Required Permits And Safety Documents.##Below Are The Size And Qty. Of The Welding Joints.# #Replacement Of New Drain Piping As Per Site Dimensions.##Edge Preparation, Fit-Up, Alignment, And Welding Of New Piping.##Installat Ion Of Pipe, Fittings, Elbows, And Accessories As Required.##Grinding And Finishing Of Weld Joints.##Restoration Of Insulation Suppo Rt Attachments, If Affected Duringreplacement.##Carry Out All Welding Activities Using Approved Wps And Qualifiedwelders.##Welding S Hall Be Performed In Accordance With Asme Requirements.##Ensure Proper Weld Identification And Traceability Throughout Thework.##Ndt / Nde (Rt/Dpt) Inspection Of All Welds.##Rectification Of Any Welding Defects Identified During Inspection.##Submission Of Welding R Ecords And Inspection Reports##Housekeeping Of The Area After Completion Of The Work.##Note: The Scope Of Work Described Here Is A G Eneral Outline. Biddersare Required To Review The Adequacy Of The Scope And Include Anyadditional Activities Necessary To Ensure The Satisfactory Completion Ofthe Job.5.0 Manpower Requirement:The Contractor Shall Provide:##Job Supervisor##Qualified Pipe Fabricator S##Qualified Welders##Skilled Technicians/Helpers##Safety Officer6.0 Contractor Responsibilities:##The Contractor Shall Verify With The Concerned Dewa Foreman/Engineerthat The Required Ptw/Lc, Hot Work Permit, And All Other Applicablepermits Are Available And Vali D Before Starting Any Work.##Assigning A Competent Job Supervisor.##Deploy Qualified Fabricator And Welding Personnel.##Submit Valid Wps, Pqr And Welder Qualifications.##Provide Tools, Tackles, Welding Machines, Lifting Equipment Andconsumables.##Ppe And Safety Eq Uipment##Submit Valid Test Certificates For Lifting Equipment, Electricaltools, Cylinders, Regulators And Hoses.##Submit Valid Calib Ration Certificates For Welding Machines Andmeasuring Instruments. Qty: 10 Drain Line Replacement Works M Station Block 10, 20 & 30 M Station Jabel Ali. [email protected] Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332602671)/$Value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2d43955e-290c-423e-b369-826e064752f5.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you