GTR 119971067

Tenders Are Invited For Replacement Of A Gas Boiler

ICB — International Competitive Bid Closes Nov 13, 2026 central europe
Tender Information
GTR Reference
119971067
Tendering Authority
Subscribe to view
Tender No
ZP.9/2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Replacement Of A Gas Boiler
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
13-11-2026
Work Detail
The Subject Of The Order Is The Implementation Of An Investment Called Replacement Of A Gas Boiler. The Scope Of The Order Includes: 1) Replacement Of The Existing 460 Kw Gas Boiler With A New Boiler, 2) Dismantling Of The Existing Gas Boiler Along With The Flue. Disassembly Of Pipeline Insulation And Technological Pipelines To The Extent Necessary. Disassembly Of The Existing Pump To Increase The Return Temperature - Pump For Reassembly (Materials From Disassembly/Demolition Will Be Deposited In The Place Designated By The Ordering Party),3) Replacement Of The Existing Flue Gas Chimney With A New One Adapted To Work (Compatible) With A Condensing Boiler,4) Removal And Disposal Of Materials From Demolition,5) Delivery And Installation Of A Double Condensing Gas Boiler 2X240kw Along With The Necessary Equipment Compatible And Recommended By The Manufacturer Boiler: Collective Exhaust Gas Duct, Equipment For Sucking Air From The Boiler Room, Hydraulic Connection Set,6) Installation Of Technological Pipelines, Fittings, Condensate Neutralizer, Condensate Drainage Installation, Insulation Of Pipelines Compatible And Recommended By The Manufacturer Of A 2X240kw Double Gas Boiler,7) Installation Of A Pump To Increase The Return Temperature For An Existing Oil Boiler,8) Delivery And Installation Of Elements Boiler Room Automation, Compatible And Recommended By The Manufacturer Of The 2X240kw Double Gas Boiler,9) Making Cabling Compatible And Recommended By The Manufacturer Of The 2X240kw Double Gas Boiler,10) Connecting The Gas Installation To The Boiler Burners,11) Extending The Main Heating Circuit Distributor To Add The Internat B Circuit,12) Implementing The Internat B Heating Circuit With Its Selection And Installation Of A Circulation Pump, Three-Way Mixing Valve, Shut-Off And Measuring Fittings, Filter, Non-Return Valve Compatible And Recommended By The Manufacturer Of The 2X240kw Double Gas Boiler,13) Performing All Necessary Tightness Tests, Adjustments And Commissioning,14) Performing The First Commissioning (The Ordering Party Allows Commissioning By A Service Authorized By The Manufacturer),15) Preparing And Submitting Appropriate Acceptance Documentation (Including As-Built), In Including, Among Others: Protocols, Certificates, Operating Instructions And Arrangements With Relevant Institutions Along With Notification For Acceptance, 16) Training Of The Ordering Partys Employees In The Use Of Equipment, 17) Preparation Of Udt Application Documentation For A Double Boiler (Incurring Any Costs), Participation Of Representatives During Udt Acceptance. Materials And Devices Must Be New, Unused, Approved For Use In Construction.2. The Description Of The Subject Of The Order And The Scope Are Set Out In Annex No. 4 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b44dd49e-2b2a-45b8-9eb3-3c07d92085f8.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you