GTR 119896668

Tenders Are Invited For Engineering Design Services – Preparation Of Design Documentation Along With Obtaining The Final Building Permit For The Project: Production Of Energy From Renewable Energy Sources Through Modern Fermentation Of Hydrolyzed Sewage Sludge Based On The Principles Of Circular Economy At The Żory Sewage Treatment Plant.

ICB — International Competitive Bid Closes Dec 01, 2026 central europe
Tender Information
GTR Reference
119896668
Tendering Authority
Subscribe to view
Tender No
744776-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services – Preparation Of Design Documentation Along With Obtaining The Final Building Permit For The Project: Production Of Energy From Renewable Energy Sources Through Modern Fermentation Of Hydrolyzed Sewage Sludge Based On The Principles Of Circular Economy At The Żory Sewage Treatment Plant.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
01-12-2026
Work Detail
Engineering Design Services – Preparation Of Design Documentation Along With Obtaining The Final Building Permit For The Project: Production Of Energy From Renewable Energy Sources Through Modern Fermentation Of Hydrolyzed Sewage Sludge Based On The Principles Of Circular Economy At The Żory Sewage Treatment Plant.. 1. The Subject Of The Order Is The Development Of Complete Design Documentation For The Sludge Treatment Center And Sludge Processing, Including The Modernization Of The Sewage System At The Żory Sewage Treatment Plant, And Obtaining A Final And Valid Building Permit Decision. The Scope Of The Subject Of The Order Includes: 1. Preparation Of Input Materials For Design (Including An Inventory Of Existing Facilities, Devices, Installations And Control Systems Intended For Adaptation, Expert Opinions On The Technical Condition Of Existing Facilities, Devices And Installations Intended For Adaptation, Necessary Research And Analyses. 2. Development Of A Concept Or Preliminary Design Including Preliminary Drawings, Diagrams, Development Concepts, Technical Parameters And Costs, After Approval Of Which The Main Design Stage Will Begin. 3. Preparation Of Design Documentation In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws 2021, Item 2454), Including: A. Construction Design To The Extent Taking Into Account The Specific Nature Of Construction Works, Including: • Plot Or Area Development Plan Prepared On A Current Map For Design Purposes Or A Copy Thereof; Architectural And Construction Design; • Opinions, Agreements, Permits, Decisions And Other Necessary Documents, In Particular The Decision - Construction Permit, B. An Executive Design Supplementing And Detailing The Construction Design In The Scope And Degree Of Accuracy Necessary To Prepare The Bill Of Quantities, The Investors Cost Estimate, The Preparation Of The Bid By The Contractor And The Implementation Of The Construction Works. Indication Of The Basis For Establishing A Detailed Description And Indication Of The Appropriate Technical Specifications For The Execution And Acceptance Of Construction Works, As Well As With The Calculation And Summary Of The Number Of Units Of Bill Of Quantities For Basic Works. 4. Preparation Of Technical Specifications Containing Sets Of Requirements That Are Necessary To Determine The Standard And Quality Of The Works, In Terms Of The Method Of Execution Of Construction Works, The Properties Of Construction Products And The Assessment Of The Correctness Of The Execution Of Individual Works. 5. Preparation Of The Investors Cost Estimate Based On The Regulation Of The Minister Of Development And Technology Of December 20. 2021 On Determining The Methods And Basis For Preparing The Investors Cost Estimate, Calculating The Planned Costs Of Design Works And The Planned Costs Of Construction Works Specified In The Functional And Utility Program (Journal Of Laws Of 2021, Item 6. Carrying Out All Activities Of The Ordering Party Related To Administrative Proceedings And Appearing Before State And Local Government Administration Bodies In The Matter).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
49116a99-7c8c-4485-ab52-24c7e037f88d.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you