GTR 119808355
Tenders Are Invited For Tramline Construction Works – Sv-Mbr-261021-002 - New Tram West Tangent, Track And Road Construction In Construction Phase I
ICB — International Competitive Bid
Closes Nov 23, 2026
Western Europe
Tender Information
GTR Reference
119808355
Tendering Authority
Subscribe to view
Tender No
730624-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Tramline Construction Works – Sv-Mbr-261021-002 - New Tram West Tangent, Track And Road Construction In Construction Phase I
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
23-11-2026
Work Detail
Tramline Construction Works – Sv-Mbr-261021-002 - New Tram West Tangent, Track And Road Construction In Construction Phase I. With This Construction Project, Construction Phase I Of The Tram West Tangent Between Laimer Roundabout / South Portal Of The Environmental Composite Tube (Uvr) At Laim S-Bahn Station And Romanplatz Will Be Realized. The Subject Of The Tender Is The Construction Of The Track And Operational Systems Of The Tram, Including The Connection To Existing Track Systems, The New Construction And Conversion Of Bus Stops And The Adaptation Of Adjacent Road Traffic Systems. The Work Is Taking Place Both In The Inner-City Street Space Along Wotanstrasse And Within The Environmental Composite Pipe. The Construction Project Essentially Includes: ->New Construction Of Approx. 2.1 Km Of Double-Track Tram Route, Of Which Approx. 200 M In The Tunnel (Uvr), ->New Construction Or Conversion Of 3 Bus Stops, ->Construction And Conversion Of Approx. 20,000 M² Of Traffic Areas Including Roadways, Sidewalks And Cycle Paths, ->Construction Of Drainage Systems As Well As Cable Protection Pipes And Infrastructure Routes, ->Adaptation And Connection To Existing Traffic And Track Systems. The Construction Area Is Characterized By Limited Space, Numerous Property Access Roads, Existing Trees, Existing Tram And Bus Stops As Well As High Traffic Loads From Motorized Private Transport, Public Transport As Well As Pedestrian And Cyclist Traffic. Accessibility To Adjacent Properties And Existing Traffic Facilities Must Be Ensured During The Construction Period. Special Requirements Arise From The Work Within The Environmental Composite Tube As Well As From The Coordination With Contractors Working In Parallel And The Interfaces To The 2Nd S-Bahn Main Line.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
07b3f0cf-e8c7-4e8b-807b-1c591b45c68d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.