GTR 119515730
Tenders Are Invited For Expansion Of The Road In Bujny Ul. Sunny
ICB — International Competitive Bid
Closes Nov 03, 2026
central europe
Tender Information
GTR Reference
119515730
Tendering Authority
Subscribe to view
Tender No
ZFP.271.1.25.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion Of The Road In Bujny Ul. Sunny
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
03-11-2026
Work Detail
1. The Subject Of The Order Is The Expansion Of The Municipal Road (Ul. Słoneczna) In The Town Of Bujny, Wola Krzysztoporska Commune.1.1. The Investment Includes The Reconstruction Of The Road In Accordance With The Decision To Authorize The Implementation Of A Road Investment No. 1/2016 Of March 9, 2016. Including, Among Others: - Construction Of A Bituminous Surface Along With The Road Structure - Construction Of A Sidewalk, - Construction And Reconstruction Of Entrances To The Property, - Reconstruction Of Ditches.1.2. The Detailed Description Of The Subject Of The Order Includes: - Annex No. 4 To The Swz Employers Guidelines - Annex No. 7 To The Swz Design Documentation - Annex No. 8 To The Swz Technical Specification For The Execution And Acceptance Of Works - Annex No. 9 To The Swz Bills Of Quantities (Attached As An Aid)1.3. The Works Should Be Performed In Accordance With The Order Documentation, Including Swz And Annexes, As Well As The Recommendations Of The Employer And The Investor Supervision Inspector. The Contractor Is Responsible For Quality And Compliance With The Technical And Quality Conditions Described For The Subject Of The Order.1.4. Due To The Fact That The Settlement Of The Order Will Be A Lump Sum, The Bills Of Quantities Attached To The Swz Are Of Auxiliary Nature. The Contractor Is Obliged To Carefully Check The Number Of Works Necessary To Be Performed Against The Design Documentation. Any Lack Of Necessary Works Resulting From The Design Documentation In The Bill Of Quantities Does Not Release The Contractor From The Obligation To Perform Them Based On The Design At The Contract Price.1.5. The Contractor Has The Right To Correct The Quantities Of Works In The Bill Of Quantities And The Billing Element Table Template According To His Own Calculations Based On The Order Documents. The Contractor Is Obliged To Make A Valuation Based On Technical Knowledge, Order Documentation, And His Own Assessment, Taking Into Account All Necessary Construction Works To Complete The Investment In Question.1.6. The Remuneration Is A Lump Sum And Its Scope Also Includes Elements Not Included In The Order Documentation, But Necessary For The Proper Performance Of Construction Works.1.7. As Part Of The Lump Sum Price, The Contractor Is Obliged To Perform The Necessary Auxiliary Activities.2. Warranty The Contractor Will Provide The Ordering Party With: - A Quality Warranty For The Entire Subject Of The Order For A Minimum Period Of 36 Months, Counted From The Date Of Final Acceptance, The Maximum Warranty Period Expected By The Ordering Party Is 60 Months, - Warranty For Defects For A Period Equal To The Offered Warranty Period, Counted From The Date Of Final Acceptance.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
54c151c8-ec0f-474e-a65f-75a03f623128.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.