GTR 119515488

Tenders Are Invited For Preparation Of Design And Cost Estimate Documentation.

ICB — International Competitive Bid Closes Oct 26, 2026 — 6 days left central europe
Tender Information
GTR Reference
119515488
Tendering Authority
Subscribe to view
Tender No
RG.271.7.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Preparation Of Design And Cost Estimate Documentation.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
26-10-2026 6 days left
Work Detail
Part 1. Reconstruction/Expansion Of Ul. Suburban In Wola Zambrowska, Zambrów Commune. The Length Of The Road To Be Reconstructed/Expanded Is Approx. 0.250 Km. The Scope Of The Reconstruction/Expansion Of The Road Is Presented In Annex No. 11 To Swz. The Reconstruction/Expansion Of The Road Is To Consist In Particular In: • Construction Of An Asphalt Road (Or Paving Stones) 5.0-5.5 M Wide, • Construction Of A Concrete Surface Asphalt Thickness Min. 9 Cm, • Construction Of Roadsides Made Of Crushed Aggregate, • Construction Of A One-Sided Sidewalk, • Construction Of A Rainwater Drainage System, • Construction Of Street Lighting, • Reconstruction/Removal Of Network Conflicts - If Necessary. The Scope Of The Order Includes The Preparation Of Full Documentation For The Issuance Of A Zrid Decision Or A Building Permit Or Notification Of Construction Works, Including 5 Pieces Of Construction Designs, 5 Pieces Of Executive Designs, 3 Pieces Of Specifications For The Execution And Acceptance Of Works In Each Industry, 3 Pieces Of Approved Design Of Permanent Traffic Organization, 2 Pieces Of Bill Of Quantities, 1 Piece Of Geotechnical Documentation, Investor Cost Estimates, Offer Cost Estimates. Additionally, All Documentation Must Be Provided In A Digital Version, On A Cd (The Investor Cost Estimate And The Offer Cost Estimate Should Also Be Provided In A File Version Compatible With Ms Excel). The Contractor Is Obliged To Perform All Works, Activities, Industry Arrangements, Zud, Administrative Decisions Necessary To Obtain A Final Decision Zrid Or Building Permits Or Notification Of Construction Works.  To Calculate The Offer Price, 10 Divisions Should Be Taken Into Account, Should It Be Necessary To Prepare Documentation For Issuing A Zrid Decision.  The Offer Must Also Include The Price For Dividing One Plot.  The Final Price Will Be Settled Based On The Actual Number Of Divisions Performed. If There Is No Need To Perform Divisions Or To Perform Them In A Smaller Or Larger Number Than Assumed In The Offer Form, The Value Of The Actual Divisions Will Be Deducted Or Added From The Offer Price. - Completion Of The Order Is Deemed To Be The Provision Of Full Design Documentation To The Ordering Party Along With A Final/Final Decision On The Permit To Implement The Zrid Road Investment Or A Final/Final Decision On A Construction Permit Or Notification Of Works With A Certificate Of No Objection.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f32cde1e-da28-4ae2-8ab2-aae9d43f289c.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you