Tenders Are Invited For Building Installation Work – Mp-110078 N13 Rg S. Bernardino Maintenance Centre, Renovation Of Existing Buildings And Expansion / Part Ii - Photovoltaic System On Roofs
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Last Date of Bid Submission
03-12-2026
Work Detail
Building Installation Work – Mp-110078 N13 Rg S. Bernardino Maintenance Centre, Renovation Of Existing Buildings And Expansion / Part Ii - Photovoltaic System On Roofs. As Part Of The Renovation And Expansion Project Of The San Bernardino Sud Maintenance Center, The Executive Design And Construction Of High-Efficiency Bifacial Photovoltaic Systems, Installed Vertically On The Roofs Of Buildings B/C/E/F, Is Required. The Photovoltaic Panels Are Integrated Into A Metal Structure And Fixed On Base Plates Covered With Gravel Ballast. The Dimensions Of Each Panel Are 1.76M X 1.13M. • Building B - Mechanical Workshop It Is Expected To Install Approximately 250 Modules On The Roof; This Corresponds To A Panel Surface Of Approximately 500 M2. A Module Power Of 455 Wp Is Assumed (Front Side), A Total Power Of 113.8 Kwp Is Obtained For The Roofs Of Building B. • Building C - Electrical Workshop And Car Wash On The Roof It Is Expected To Install Approximately 240 Modules; This Corresponds To A Panel Surface Of Approximately 480 M2. A Module Power Of 455 Wp (Front Side) Is Assumed, A Total Power Of 109.2 Kwp Is Obtained. • Building E - Warehouse It Is Planned To Install Approximately 44 Modules On The Roof; This Corresponds To A Panel Surface Of Approximately 88 M2. A Module Power Of 455 Wp (Front Side) Is Assumed, A Total Power Of 20 Kwp Is Obtained. • Building F - Utgr Maintenance Building On The Roof It Is Planned To Install Approximately 153 Modules; This Corresponds To A Panel Surface Of Approximately 300 M2. A Module Power Of 455 Wp (Front Side) Is Assumed, A Total Power Of 69.6 Kwp Is Obtained.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
185c7078-70b9-4462-9d66-fdbc1cab0177.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.