GTR 119372483

Tenders Are Invited For Construction-Site Supervision Services - Implementation Of Construction Supervision During The Implementation Of The Cmr Of A Site: Construction Of A Photovoltaic Plant For Own Consumption And Partial Air Conditioning Of The Chitalishte Building St. St. Cyril And Methodius 1894 In The Town Of Topolovgrad

ICB — International Competitive Bid Closes Nov 12, 2026 Eastern Europe
Tender Information
GTR Reference
119372483
Tendering Authority
Subscribe to view
Tender No
707625-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction-Site Supervision Services - Implementation Of Construction Supervision During The Implementation Of The Cmr Of A Site: Construction Of A Photovoltaic Plant For Own Consumption And Partial Air Conditioning Of The Chitalishte Building St. St. Cyril And Methodius 1894 In The Town Of Topolovgrad
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
12-11-2026
Work Detail
Construction-Site Supervision Services - Implementation Of Construction Supervision During The Implementation Of The Cmr Of A Site: Construction Of A Photovoltaic Plant For Own Consumption And Partial Air Conditioning Of The Chitalishte Building St. St. Cyril And Methodius 1894 In The Town Of Topolovgrad. Continuation From Section Description (Bt-24-Procedure): 5) Control Over The Conformity Of The Materials And Products Used, According To The Requirements Of Ordinance No. Rd-02-20-1 Of 05.02.2015. On The Terms And Conditions For Placing Construction Products In The Constructions Of The Republic Of Bulgaria. In This Regard, It Carries Out Control Inspections Of The Construction Products Delivered To The Construction Site, Which Are Used In The Construction, In Order To Ensure Compliance With The Requirements Of Art. 169A, Para. 1 And Regulation No. Rd-02-20-1 Of 02.05.2015. On The Terms And Conditions For Placing Construction Products In The Constructions Of The Republic Of Bulgaria, Incl. Carries Out Checks For Compliance Of: The Technical Indicators Of The Delivered Construction Products With The Data In The Declaration Of The Characteristics Of The Construction Products Presented By The Cmr Contractor, The Declaration Of Operational Indicators And Test Reports, With The Technical Indicators And Characteristics Laid Down In The Approved Investment Project, As Well As From The Detailed Quantity And Value Accounts For The Object: 5.1. Preliminary Detailed Familiarization With The Offer Of The Smr Contractor In Connection With The Performance Of The Activity; 5.2. As A Result Of Sub-Activity 5.1., As Well As In Connection With The Constant Presence Of Representatives Of The Contractor On The Site - Control Over The Compliance Of The Materials And Products Used, Both In Relation To The Applicable Legislation In Force And In Accordance With The Contract With The Contractor Of Smr. 6) Prepares A Technical Passport Of The Construction, According To The Requirements Of Ordinance No. 5/28.12.2006. The Technical Passport Is Submitted To The Contracting Authority On Paper In 6 (Six) Copies, Accompanied By An Electronic Medium In Doc And Pdf Format Corresponding To The Paper Ones. The Electronic Copy Is Presented On A Cd Or Other Electronic Medium: 7) Prepares A Final Report To The Contracting Authority, According To The Requirements Of Zut, After Completion Of The Construction And Installation Works. The Report Is Submitted On Paper In 6 (Six) Copies, Accompanied By An Electronic Medium In .Pdf And .Doc Format Corresponding To The Paper Ones. The Electronic Copy Of The Report Is Submitted On A Cd Or Other Electronic Medium; 8) Controls The Quality Of The Performed Smr And Prevents, With Its Actions Within Its Competence, The Violation Of Their Technological Consistency, By Issuing Prescriptions And Orders, Which It Enters In The Construction Order Book: 8.1. Monitoring For The Correct Observance Of The Technological Sequence During The Execution Of The Smr For The Construction On The Basis Of The Contract With The Smr Contractor, As Well As Good Construction Practices; 8.2. Entry In The Order Book Of Orders In Cases Where The Smr Deviates From The Sequence Resulting From The Contract With The Smr Contractor And/Or Good Construction Practices. 9) Constant Monitoring Regarding Compliance With The Schedule For The Implementation Of The Smp, As Well As Monitoring For Deviations From Them And Timely Reporting To The Contracting Authority Regarding Any Deviations That Occurred In The Process Of Executing The Works. Requirement Of Measures By The Contractor Under The Smr Contract For
Key Value
Tender Value
3,824 - BGN
Tender Documents
Global Tender Document
a3a7f280-5428-4985-9e87-4eca5957a165.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you