GTR 119337463
Tenders Are Invited For Purchase Of Vertical Planning Works On The Master Plan Within The Framework Of The Construction Project Of Forest Park And Multifunctional Recreation Areas In Aghdam
ICB — International Competitive Bid
Closes Nov 12, 2026
Western Asia
Tender Information
GTR Reference
119337463
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Purchase Of Vertical Planning Works On The Master Plan Within The Framework Of The Construction Project Of Forest Park And Multifunctional Recreation Areas In Aghdam
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
12-11-2026
Work Detail
Filling Pits And Trenches With Bulldozers By Moving The Soil Up To 5 M, Power Of The Bulldozer: 59 (80) Kw (A.G.), 1St Group Soil (Consolidation Of Fertile Soil), Excavation Of The Soil With Excavators With A Capacity Of 1(1-1.2) M3, Loading The Soil From Dump Trucks, Soil Group: 1 (Loading Fertile Soil Into The Machine), Dump Truck, 20 T Transport Distance - 2 Km. 1St Class Cargo, Execution Of Works At The Site Of Soil Spillage, Soil Group: 2-3, Excavation Of The Soil With Excavators With A Capacity Of 1(1-1.2) M3 By Loading The Dump Truck, Soil Group: 2 (Excavation In Vertical Planning), 20 T Transport Distance - 2 Km. Class 2 Load (Soil To Be Used In Vertical Planning), Filling Pits And Trenches With Bulldozers By Shifting The Soil To A Distance Of Up To 5 M, 2Nd Group Of Soil (Performance Of Works At The Site Of Soil Spillage), Add To Norm 01-01-033-02 During Every Next 5 M Of Soil Transportation, Wetting The Compacted Soil With Water, Compaction Of The Soil In The First Pass With A Vibrating Roller Of 12-14 Tons On One Track, Layer Thickness: 20 Cm, During Each Subsequent Trip On One Trail, Add To The Norm 01-02-012-01, 20 T Transport Distance - 5 Km. 2Nd Class Cargo, Temporary Buildings And Facilities - 1.2%: (Only For Construction And Installation Works), Additional Costs Incurred During Construction And Installation Works During Winter (0.5*0.8=0.4%), Reserve Funds For Unplanned Works And Expenses (2%):
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a3ac4619-df0c-4768-8099-ba63a98a39cf.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.