GTR 119323061
Bids Are Invited For Gsu - Rfq Replace Terminal Units, Clarkston Building Ch, Ground, 1St, And 2Nd Floors
ICB — International Competitive Bid
Closes Nov 12, 2026
Northern America
Tender Information
GTR Reference
119323061
Tendering Authority
Subscribe to view
Tender No
50900-eRFQ-002084-2027
Financer Name
Self-Funded
Work Title
Bids Are Invited For Gsu - Rfq Replace Terminal Units, Clarkston Building Ch, Ground, 1St, And 2Nd Floors
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,APAC (Asia Pacific)
Last Date of Bid Submission
12-11-2026
Work Detail
This Request For Quotes (Rfq Or Sourcing Event) Is Being Issued To Establish A Contract With A Qualified Supplier Who Will Meet The State Entity¿S Needs As Described In This Sourcing Event. This Rfq Process Will Be Conducted To Gather And Evaluate Responses From Supplier For Potential Award. All Qualified Suppliers Are Invited To Participate By Submitting Responses, As Further Defined Below. After Evaluating All Suppliers¿ Responses Received Prior To The Closing Date Of This Sourcing Event And Resolution Of Any Contract Exceptions, The Preliminary Results Of The Rfq Process Will Be Publicly Announced, Including The Names Of All Participating Suppliers And The Evaluation Results. Subject To The Protest Process, Final Contract Award(S) Will Be Publicly Announced Thereafter.The Scope Of Work For This Project Will Include The Replacement Of The Dual Duct Terminal Units On The Ground Floor,1St Floor, And 2Nd Floor Of The Ch Building. Only The Terminal Units That Have Not Been Part Of Recent Renovations Willbe Replaced. The Temperature Sensors Associated With These Units Will Be Replaced As Well. The Contractor Willdemolish And Replace Ductwork Connected To The Terminal Units And Duct Mains As Needed To Replace Terminal Units.The Scope Also Includes Any Remaining Pneumatic Controls To Be Replaced With Electronic Controls. Controls Vendorto Extend Existing 120V Power To New 24V Power For Controlling The New Terminal Units. Updates To The Buildingmanagement System (Bms) Controls, Including Sequence Of Operations And Schematics, Are Also Required, And Thenew Terminal Units Will Be Controlled The Same As The Existing Terminal Units. All Work Shall Take Place From The Endof The Spring Semester To One Week Before The Start Of The Fall Term And Shall Be Completed Within 95 Calendar Days.Work Can Be Performed During Normal Working Hours With The Following Exceptions: Remove And Replace Terminalunit In Room Ch2182 (Testing Room) After Normal Working Hours; Terminal Units In Ch1201 And Ch1204 (Nursinginstructional Lab Area) Can Be Replaced During Normal Work Hours Except For A Period Of Three Weeks (5/18/2027 To6/11/2027).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
59189a71-cbf6-4596-a15e-aee2e6d7d5ef.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.