GTR 119320930

Tenders Are Invited For Construction Work For Swimming Pool – Renovation Of The Island Pool - Construction Stage 2B - Stainless Steel Pool System - Diving Pool

ICB — International Competitive Bid Closes Nov 13, 2026 Western Europe
Tender Information
GTR Reference
119320930
Tendering Authority
Subscribe to view
Tender No
703526-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work For Swimming Pool – Renovation Of The Island Pool - Construction Stage 2B - Stainless Steel Pool System - Diving Pool
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
13-11-2026
Work Detail
Construction Work For Swimming Pool – Renovation Of The Island Pool - Construction Stage 2B - Stainless Steel Pool System - Diving Pool. Stainless Steel Pool System Springer Pool: The Public Outdoor Pool In The City Of Landsberg Am Lech Was Completely Renovated Around 45 Years Ago And Has Remained In Operation Essentially Unchanged Since Then. The Island Pool Consists Of A Main Building With A Basement, Ground Floor And Upper Floor As Well As A Pool Complex With A 50 M Sports Pool, Wave Pool, Diving Pool And Childrens Paddling Pool. There Are Two Grp Water Slides Between The Wave Pool And The Diving Pool. The Pool Water Technology And A District Heating Center Of The Landsberg Municipal Utility Are Housed In The Basement. The Cloakrooms, Changing Rooms And Wet Rooms Are On The Ground Floor, And The Outdoor Pool Catering Is On The Upper Floor. The Basement Is Accessed Via A (Narrow) Spiral Staircase From The Ground Floor And Via An Entry Opening At The Southeast Corner Of The Building. The Pools Were Built In Reinforced Concrete And Lined With Ceramic. They Have A Longitudinal Or Transverse Flow And An Overflow Channel. In Principle, All Materials Used In The Project Must Be Suitable And Approved For Use In A Public Swimming Pool. As Part Of The General Renovation Of The Landsberg Am Lech Island Resort, The Following Construction Measures Are Planned In The Four Planned Construction Stages: • Construction Stage 1 - Completed Construction Stage: Extension Of The Basement For The Pool Water Technology And The Heating Center • Construction Stage 2A - Completed Construction Stage: • Demolition Of The Existing Pool Water Technology • New Construction Of A Pool Water Treatment System Up To The Interface With The External Piping • Renewal Of The External Piping To The Pools • Renewal Of The 50 M Pool • Renewal Of The Wave Pool • New Construction Non-Swimmer Pool • Construction Stage 2B: • Renewal Of Diving Pool • Renewal Of Slides Note For This Tender: Only The Stainless Steel Pool System - Diving Pool Of Construction Stage 2B Is Requested For This Tender. • Construction Stage 3 – Execution Not Yet Planned: Demolition Of The Existing Building On The Ground And Upper Floors, Construction Of A New Infrastructure Building.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
83d36d9b-b03c-43c9-baaa-a104ffba28a8.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you