GTR 119260292
Tenders Are Invited For Scaffolding Work – Nss New Building 2-Field Sports Hall, Schwerin, Ve060 Scaffolding Work
ICB — International Competitive Bid
Closes Nov 16, 2026
Western Europe
Tender Information
GTR Reference
119260292
Tendering Authority
Subscribe to view
Tender No
700788-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Scaffolding Work – Nss New Building 2-Field Sports Hall, Schwerin, Ve060 Scaffolding Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
16-11-2026
Work Detail
Scaffolding Work – Nss New Building 2-Field Sports Hall, Schwerin, Ve060 Scaffolding Work. The Subject Of The Service Award Unit Ve 060 Scaffolding Work Is The Assembly And Dismantling As Well As The Provision For Use For Approx. 20 Weeks Of Work And Protective Scaffolding Din 4420 For Use For Assembly Work, Including Rear-Ventilated Timber Facade Cladding, Aluminum Sheet Metal Storage, Sills, Cover Strips For The Window Construction And P/R Facades Trades, Aluminum Attic Storage As Well Technical Expansion, Among Other Things, Rw Downpipes, Lightning Protection, Ventilation Grilles On The Outer Walls Of A Sports Hall With A Social Wing In Wooden Construction From Ok Reinforced Concrete Floor Slab As Well As Protection Against Falls For The Execution Of Roof Sealing Work. Facade Scaffolding According To Din En 12810: Execution Of Approx. 1,682M2 Of Length-Oriented Standing Scaffolding Lk3 Sw09 With Internal Ladders, Erection Of Scaffolding On 7 External Walls In Wooden Frame Construction; Attic Heights From Okg Approx. 9.60 To 10.95M Sports Hall/Main Access, Approx. 7.40M Social Wing; Execution Of The Top Scaffolding Layer As A Catch Position With Railings And Side Protection According To Din 4420-1, Approx. 58M Side Protection (Inner Railing) Facade, 2 Scaffold Stair Towers As Single-Flight Platform Stairs According To Bgr 113 And Din En 12811-1 Working Scaffolding, Made Of System Parts Integrated Into The Facade Scaffolding, 3 Transitions From The Scaffolding Layer To The Roof Structure Approx. 14M Bridging, Approx. 12M Protective Roofs To Protect The Access Areas From Falling Objects, Approx. 255M2 Protective Nets As Scaffolding Cladding. Other: 1 Staircase, Single-Flight For Vertical Access To One Floor, Bridging Floor Height Approx. 3M; Approx. 45M Of Building Protection Measures On The Flat Roof; Technical Processing: Project Planning = Creating Workshop And Assembly Planning Scaffolding Evidence = Creating Scaffolding Statics Construction Site Equipment: Setting Up, Operating And Maintaining All Measures, Aids, Equipment And Service Facilities On The Construction Site Until The Service Is Completed And Dismantled Without Leaving Any Residue. Assembly: Lifting Equipment For The Delivery And Assembly Of The Components To The Installation Site.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
47d1ee35-3749-4b0f-80ea-4d31d45e07a4.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.