Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Vfn – Reconstruction Of Heat Distribution In Collectors - Design And Engineering Activities

ICB — International Competitive Bid Closes Nov 13, 2026 Eastern Europe
Tender Information
GTR Reference
119259571
Tendering Authority
Subscribe to view
Tender No
702615-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Vfn – Reconstruction Of Heat Distribution In Collectors - Design And Engineering Activities
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
European Union
Last Date of Bid Submission
13-11-2026
Work Detail
Architectural, Construction, Engineering And Inspection Services – Vfn – Reconstruction Of Heat Distribution In Collectors - Design And Engineering Activities. • The Subject Of The Performance Of The Public Contract Is The Development Of Project Documentation, Ensuring Engineering Activities And Copyright Supervision, Including Other Related Activities For The Work: Vfn Prague - Area A - Reconstruction Of Engineering Networks In The Collectors For The General Faculty Hospital In Prague (Hereinafter Also Referred To As Vfn) In Area A Of The General Faculty Hospital In Prague, P. No. 1645 C.Ú. New Town. • The Intention Is A Complete Reconstruction Of The Backbone Distribution Of Heat, Hot And Cold Water Conducted In Underground Collectors. • Necessary Electrical Installation Repairs, Lighting Replacement, Installation Of Technical Electrical Distribution Are Part Of The Plan. Energy For Future Service And Repair Work In The Collector, Commissioning Of Drainage Channels And Ensuring Their Subsequent Connection To The Sewage System. • Taking Into Account The Nature Of The Hospitals Operation, A New Heat And Hot And Cold Water Distribution System Will Be Built In Parallel With The Original Distribution Systems, To Which The Individual Media Will Be Gradually Connected In Stages, While The Original Distribution System Will Be Disrupted At The Same Time. All Construction Work Will Be Carried Out In A Coordinated Manner Before The Installation Of New Distribution Lines And After The Dismantling Of The Original Distribution Lines. • There Is A Network Of Pipe Mail In The Collectors, Which Will Be Preserved. In Cases Where There Will Be A Collision With The Distribution Of The Pipe Mail Due To Partial Repositioning Of The Pipes, It Will Be Dismantled At The Point Of Collision, And After The Repositioning Of The Heat Distributions, The Route Of The Pipe Mail Will Be Modified So That It Does Not Impede Traffic In The Collector And Does Not Obstruct The Passage. • Technical Gas Distributions Are Run In The Collectors, Which Will Be Interfered With Only If The Collision Situation Cannot Be Resolved Otherwise. Energy And Pipeline Mail Distribution. • Requirements For Project Documentation A) Processes The Survey Of The Current State Of The Collector, Additions And Updates Of The Existing Technical Documentation In *.Dwg Format, The Output Will Be A 3D Model, Updated Documentation Of Existing Heat And Water Distribution Systems, Design Of New Distribution Systems, Including Temporary Translations In *.Dwg Format. B) He Will Organize Inspection Days Of The Designer, For A Minimum Of 2 Hours Once Every 14 Days, At The Clients Headquarters With The Client And Expert Designers Who Will Participate In The Project Preparation. The Designers Inspection Days Will Be Held Throughout The Project Preparation Period, With The Assumption That Until The Start Of Construction, The Client Has The Right To Change The Scope And Dates Of The Inspection Days. C) The Documentation Will Include A List Of Works, Supplies And Services With A Statement Of Measurements. The Acreage Report Will Be Broken Down According To Individual Stages. D) The Measurement Statement Will Be Valued According To The Current Prices Of Construction Works And Works According To The Úrs Price System. E) Documentation Of The Actual Execution Will Be Drawn Up And Handed Over To The Client In 3 Printed Copies And In Electronic Form On 3 Usb Memory Sticks. • Cooperation In The Selection Of The Contractor A) Part Of The Performance Of The Public Contract Is
Key Value
Tender Value
4,750,000 - CZK
Tender Documents
Global Tender Document
ca7e0329-6903-4ec9-a5ab-b3ca547306e2.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you