GTR 119212184
Tenders Are Invited For Reconstruction Of The District Road P 1259R Gniewczyna Łańcucka - Grodzisko Dolne
ICB — International Competitive Bid
Closes Oct 26, 2026
— 5 days left
central europe
Tender Information
GTR Reference
119212184
Tendering Authority
Subscribe to view
Tender No
UIB.271.16.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The District Road P 1259R Gniewczyna Łańcucka - Grodzisko Dolne
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
26-10-2026
5 days left
Work Detail
1. The Subject Of The Order Is Reconstruction Of The District Road P 1259R Gniewczyna Łańcucka - Grodzisko Dolne, At Km 0+923-2+288. 2. The Scope Of The Subject Of The Order Includes: 1) Measurement Works, 2) Earthworks (Removal Of The Topsoil Layer, Trenching, Excavations And Excavations), 3) Concrete Subbases, 4) Crushed Stone Subbases - Top Layer Of Crushed Stone Surfaces, 5) Cleaning Of Road Surfaces, Mechanically, 6) Sprinkling The Surface With Asphalt, 7) Surfaces From Mineral-Bituminous Mixtures (Binding Layer, Wearing Course), 8) Installation Of Channels From Pvc Pipes, 9) Manual Laying Of Roadsides, 10) Milling, 11) Supplementing The Roadsides With Stone Material, 12) Horizontal And Vertical Road Markings, 13) Dismantling Of Barriers, Delivery And Installation Of New Protective Barriers. 3. A Detailed Description Of The Subject Of The Order Is Specified In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works, Bill Of Quantities Constituting Annex No. 7 To The Swz And The Draft Provisions Of The Contract Constituting Annex No. 6 To The Swz. Note: The Attached Design Documentation Covers A Wider Scope Than That Required For Execution Under This Procedure.4.Due To The Fact That The Remuneration Will Be A Cost Estimate, The Bills Of Quantities Attached To The Swz Are Binding. The Contractor Is Obliged To Prepare An Offer Cost Estimate Based On The Bills Of Quantities Received From The Ordering Party, Using The Price Base He Adopted For Cost Estimation And After Adding Vat. The Bid Cost Estimate Should Be Consistent With The Bill Of Quantities And Should Include The Basis For The Valuation Of The Works, A Description Of The Works Consistent With The Description Included In The Bill Of Quantities, The Measurements Used In The Bill Of Quantities And The Net Unit Price For Each Item Of The Bill Of Quantities.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d1695916-dc5f-4ab2-a373-35b3f2b8a96b.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.